Here is the list including
some of our completed projects. Click on the name of a project to find
out more about it:
You can also read on the current projects
and see our
full reference list.
SERVICE
CONTRACT FOR RZESZOW CCGT PLANT
The project includes preparing tender announcement and a complete
tender specification as well as offer evaluation, contract negotiations
and drafting the service contract in accordance with the new Public
Procurement Law.
MODERNISATION
CONCEPT FOR TURBINE HALL EQUIPMENT AT BELCHATOW POWER PLANT
ELSAMPROJEKT Polska in co-operation with its mother company Elsam
Engineering A/S is to prepare modernisation concept for turbine hall
equipment at Belchatow Power Plant.
Elektrownia Belchatow was built in the 1980s as a very modern
state-of-the-art plant. Belchatow units were commissioned from 1980 to
1988. The last unit (unit 12) was commissioned 14 year ago. Belchatow's
oldest units have reached approx. 130,000 hrs operation, and another
six have exceeded 100,000 hrs. Through overhaul and modernisation the
plant equipment has been maintained in good technical condition to
achieve high availability and power generation efficiency higher than
the design value.
Further operation of the plant is possible and well justified but
considering the technical progress of the last quarter of a century,
modernisation has become a must. Considering variuos degree of
technical and moral wear of the plant equipment, the scope of
modernisation allowing for further efficient operation remains an open
question. Formulating a modernisation programme will be preceded by
complex analyses of the options available, in order to select the
optimal modernisation alternative. Belchatow Power Plant is conducting
analytic studies as part of "Complex Reconstruction and Modernisation
Programme for Belchatow Power Plant in 2007-2011". As part of the
Complex Modernisation Programme, ELSAMPROJEKT Polska in co-operation
with its mother company Elsam Engineering A/S is to prepare Modernisation
Concept for Turbine Hall Equipment.
Main objectives of turbine hall equipment modernisation are to:
- extend the total operation time of the units
- extend the intervals between main overhauls of
turbine sets
- improve efficiency figures
- improve availability and reliability
We believe that it is possible to achieve these goals through adopting
various solutions, some of them more attractive than others. A concept
including many alternative solutions will enable the Orderer to take
the correct stategic investment decisions.
Preparing modernisation concept for a power plant as big as Belchatow
is a unique project in the European energy sector and requires a unique
approach from the contractors. It is necessary to create a team of
experienced consulting engineers and to take advantage of the
manufacturers' know-how. The consultant team working on the
modernisation concept will include operation and maintenance
specialists from state-of-the-art Danish power plants (Skaerbaek and
Nordylland), which are at the moment the most efficient power plants in
the world, while maintaining high availability standards.
Back to the
top of this page.
DEFECT LIABILITY ENGINEER
IN WROTKOW CCGT PROJECT
After succesful competion of the duties of Owner's Engineer for the
construction of 239 MW CCGT plant in Lublin-Wrotków by the
consortium of ELSAMPROJEKT Polska and ENERGOPOMIAR Gliwice, the
Management of Lublin-Wrotków CCGT has decided to employ
ELSAMPROJEKT alone as Defect Liability Engineer.
Back to the
top of this page.
OWNER'S ENGINEER IN
CHORZOW CHP PROJECT
In 2000, Elektrocieplownia Chorzow Elcho Sp. z o.o. awarded the Turnkey
Engineering, Procurement and Construction Contract for a combined heat
and power plant in Chorzow, Poland, with two hard coal fired units of
102MWe, 180MWt each to the consortium consisting of Foster Wheeler
Energia Oy (a Finnish joint stock company) and Foster Wheeler Energia
Polska Sp. z o.o. (a Polish limited liability company).
Elcho appointed Mott MacDonald Ltd. (a U.K. based consulting company)
as a Project Owner's Engineer. Considering the specific Polish
conditions and Elsamprojekt's position and abilities Mott MacDonald
subcontracted such important scope of their activities as site
construction and commissioning supervision and management, part of
engineering review and factory inspections to Elsamprojekt Polska Sp. z
o.o. In order to fulfil these obligations Elsamprojekt created a
dedicated and experienced team of engineers covering three following
fields: site activities, engineering review and factory inspections.
A Notice To Proceed was issued on October 31, 2000 and first civil
works on site were commenced in winter 2001. The Project Schedule
foresees the first firing of unit No.1 in December 2002 while the whole
facility substantial completion is scheduled for October 2003.
At present the construction works are well advanced and focused on
boilers' steel structures and TG foundations as well as BOP
installations and systems. In parallel the Contractor is proceeding
with the engineering and procurement activities.
The new Elcho CHP Plant will operate using state of art modern
technologies, including Circulating Fluidised Bed boilers and Siemens
manufactured steam turbines.
These technologies will ensure low emission levels while firing low
quality hard coal - both aspects being quite important for the Upper
Silesia region.
Back to the
top of this page.
OWNER'S ENGINEER IN
BIALYSTOK CHP PROJECT
EC Bialystok (CHP Bialystok) has decided to install a condensing
turbo-set of 23 MWe in order to boost its electricity production as
well as optimise the operation of existing back-pressure units
especially in the low heating demand period. The turboset will be fed
from auxiliary or from Unit 1 extraction header ( max. 13 bar, 260oC
).
It has been decided that this will be a split package type project with
separate tenders for the various components:
- Turboset
- Cooling tower
- Electrical (transformers, switchgear, etc.)
- Pumping station
- Other
ELSAMPROJEKT scope is:
- Verification / preparation of technical part of
package tender specifications
- Evaluation of offers
- Contracts review prior to signing
- QC activity during manufacture and construction
- Supervision of commissioning
- Supervision of performance tests
On this project ELSAMPROJEKT is working in a team
with ENERGOINWEST
Bialystok S.A. (daughter company of EC Bialystok) and EC Bialystok
staff.
Back to the
top of this page
OWNER'S ENGINEER IN
RZESZOW CCGT PROJECT
A "turn-key" Contract for the erection of a CCGT plant has been signed
between Elektrocieplownia Rzeszow (Rzeszow CHP Plant) and the
consortium Lurgi Lentjes - Ansaldo. The plant has a capacity of 95.75
MWe and 76.3 MWt and the takeover for commercial operation is expected
in January 2003.
On 23 January 2001, the consortium of Elsamprojekt Polska and
Energopomiar signed a Contract with Elektrocieplownia Rzeszow for the
performance of the services of Owner's Engineer. We are responsible for
the comprehensive supervision of the erection works from the technical,
financial, legal and contractual side. The scope of work include the
verification of the design works, the inspection of equipment
delivered, the inspection of the civil and erection works, control of
the progress of the works according to the time schedule and acceptance
of the payments, and participation in the tests of the unit.
From the technological point of view, Elsamprojekt Polska is
responsible for the gas turbine and the HRSG (heat recovery steam
generator). When necessary, Elsamprojekt Polska is supported by Danish
experts from its parent company Elsam
Engineering A/S.