Certificate 9444 QMS 2011O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoHeat accumulatorsBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



Specifications



Client/Year Project description
Vattenfall Heat Poland
2010-2011,
2011- in progress
Siekierki CHP boiler OP230 K-1 conversion to biomass fired BFB boiler. The project includes conversion of the boiler and implementation of biomass handling systems with the systems enabling deliveries of approx.. 320,000 t/a biomass by rail and by road.
A feasibility study was prepared to determine the project concept. The study analysed two solutions for boiler operation: common steam header with other boilers or as a separate unit (boiler + turbine set).
Concept of flue gas condensing system and biomass handling (320,000 t/a pellets) was described. Economic analysis of the project was made as a basis for optimising project alternatives.
The scope of work also included preparation of environmental impact report and an application for environmental permit and preparing an application for land development conditions, including permitting procedures and obtaining the said permits for the project.
The work also included preparation of tender documents (tender specification, contract) for two tenders: to select unit modernisation contractor and biomass handling system contractors, as well as participation in the evaluation and selection of contractors.

ENERGA Elektrownie Ostrołęka S.A.
2009 - in progress
Preparing the project of Ostrołęka C Power Plant construction (first unit approx. 1000 MWe). The scope of work included the Concept Study including detailed feasibility study of the project and environmental documentation, as well as materials for the tender to select the Contractor for Ostrołęka C Power Plant construction.
As part of feasibility study, construction of new power plant with 1000MW unit (PF boiler fired with coal with up to 20% of biomass co-firing possibility) with a cooling tower. A financial and economic analysis of the project was made, as well as sensitivity analysis, risk analysis and business plan for the project.
The work also included support for the Client in the procedures related to the environmental decision for the project.
The scope of work covers also preparation of full Tender Specification (including draft Contract) for tendering procedure based on Public Procurement Law (negotiated procedure with publication), participation in negotiations and assistance for the Client during entire tendering process.

PGE Elektrownia Opole S.A.
2009-2011
Technical consultancy in the tendering procedure to select the Contractor for biomass handling system and biomass feeding installation in compliance with Public Procurement Law, including also preparing Tender Specification, tender evaluation and participation in negotiations.
As a result of tendering procedure, the Contract was awarded.

DONG Energy A/S
2009-2010
Owner’s Engineer services during the construction of Karcino Wind Farm (51 MW).
The scope of work included preparing tender specification for EPC Contract based on FIDIC for electrical and civil engineering part, participation in negotiations with contractors and Owner’s Engineer service for electrical and civil engineering part.

PGE EC Rzeszów S.A.
2009-2010
Commercial, legal and technical consultancy related to the selection of Contractor for the construction of cogeneration unit based on vegetable oil fired Diesel engines (electrical capacity of engines system – 25-30 MW).
The scope of work covered the complete tender documentation for tender with negotiations (including Functional Programme and EPC Contract), participation in the entire process of contractor selection and advice in formulating optimum business solutions until signing the contract.
The tendering procedure was conducted.

PKN Orlen S.A.
2009
Preparing implementation of the project „Construction of 2x420-460MW near Anwil S.A. area in Włocławek”.
The works included preparing Feasibility Study analysing multiple alternatives for a two-phase construction of two CCGT units. Construction alternatives were presented. A closed cycle cooling system with cooling towers was analysed as well as an open cooling system using the Vistula river water. Technical and legal conditions for power plant construction were prepared. A preliminary concept for power export and gas fuel supply was presented, determining also the conditions of the local gas network operator. Economic analysis of the alternatives was made, basing on long term prices forecasts.
Guidelines for the Environmental Impact Assessment were prepared. General Investment Costs Schedule was prepared, together with the project budget. Project profitability analysis was also implemented.
Technical Appendix to Tender Specification for Turn-Key Delivery of CCGT Unit was prepared.

Vattenfall Heat Poland
2008-2011
Participation in tendering procedure to select EPC Contractor for Siekierki CHP unit implementation.
The subject of tender is an extraction/condensing CHP unit with an open cooling system, with a gross electrical capacity of approx. 480 MW. The unit is to operate with the following steam parameters: live steam not lower than 600°C and reheat steam not lower than 600°C. The unit will have a pulverized fuel boiler fired with hard coal (with biomass pellets co-firing possibility) with a complex flue gas cleaning system. The unit will also produce heat for Warsaw district heating system.
As part of the work, the unit concept was optimised and Tender Specification for the unit was prepared, covering technical, commercial and legal aspects for EPC project implementation.
Tendering procedure based on Public Procurement Law was conducted as negotiated procedure with publication. The scope of work included cooperation with tender evaluation and participation in negotiations.
As a result of tendering procedure, final bids were submitted and evaluated.

Vattenfall Heat Poland
2006
FGD plant for Siekierki CHP Plant in Warsaw.
The scope of work included preparing a concept for FGD and a new chimney stack for Siekierki CHP, for the existing coal-fired units and the planned new unit, including analysis of several alternatives. The study compared the FGD concepts based on wet lime technology, semi-dry method and dry method. As a continuation of the conceptual work on multiple alternatives, a detailed FGD concept for coal fired boilers at Siekierki CHP was prepared.
Works included preparing the application and appendices for the application for issuing construction conditions for the selected alternative. Tender Specification was also made for FGD system with two absorbers for 8 boilers, for 3.1 million Nm3/h, including functional programme and the technical part of the contract with appendices necessary for public procurement procedure.
FGD system at Siekierki is currently under construction.

EC Białystok S.A.(E.On Group)
2006
Preparing tender specification for conversion of OP-140 boiler to a biomass fired fluidised bed (BFB) boiler and implementation of biomass handling system at Białystok CHP Plant.

J-Power
2006-2008

Zajączkowo Wind Farm project. Services included preparing tender specification for a wind farm in north-western Poland, consisting of 24 x 2MW. In the implementation phase Elsamprojekt performed the function of Owner’s Engineer.

Elsam A/S
2006-2007
Ostrowo Wind Farm project. Services include preparing tender specification for a wind farm in north-western Poland, consisting of 17 x 1.8 MW wind turbines, based on FIDIC and participation in negotiations with contractors. In the implementation phase Elsamprojekt performed the function of Project Manager and was responsible for Owners Engineer services (electrical systems and civil works) and Project Management.

J-Power
2006
Due diligence and review of documentation for a wind farm to be constructed in northern Poland (Zajączkowo, 24x2MW),, carried out for the Investor in order to provide a basis for the final decision on project implementation.

Elana Energetyka
2005

Technical and economic audit at industrial CHP Plant Elana Energetyka to formulate reorganisation guidelines. The audit included two CHP plants fired with coal and heavy fuel oil (6 steam boiler with 4,5 MWe turbine and 3 steam boilers with 20 MWe turbine), compressed air, cool, nitrogen systems as well as water supply and sewage system.
As part of the work, potential of the existing equipment was assessed and rationality of the investments conducted and planned so far. Possible development concepts and directions were prepared for modernisation projects.

AES Horizons Ltd.
2002

Involved preparation of tender materials.
Involved in permitting procedures for a 250 MW CCGT project in Żarnowiec, Northern Poland.

Zielona Góra CHP Plant
2001

Verification of tender documentation for the second stage of tendering procedure for a 190 MWe CCGT CHP plant in Zielona Góra.


EC Białystok S.A.
2001
Verification and preparation of tender materials for construction of a 20 MWe condensing turboset at Bialystok CHP Plant.
Participation in tender evaluation and selection of the Contractor.
The project is based on a number of contracts (turbine set, DCS cooling tower, equipment deliveries).

Elektrownia „OPOLE” S.A.
2000

Tender specification and offer evaluation for turbine modernisation and preparation of heat extraction. For three 18K360 turbines with a capacity of 360 MWe each.


Elektrociepłownia Rzeszów S.A.
1999
Preparation and verification of tender specification for EC Rzeszów CCGT (95 MWe);
Tender evaluation.
Contract negotiations.
The tender was prepared based on Public Procurement Law.

Zamojska Spółka Elektroenergetyczna Eastern Generation
1998

Preparation of full tender documentation for turn-key project involving construction of 100-120 MW CCGT plant in Jarosław. Participation in negotiations with Polish Oil and Gas Company (PGNiG) and distribution company.