O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



References


Shown below is our full reference list.

Klient/Rok Opis przedsięwzięcia

EC Białystok S.A
2008

Concept of a heat recovery system from flues gas condensation for a 75 MW boiler fired with biomass (fuel humidity approx. 40%). The study presented multiple alternatives for the 13-15 MW system consisting of a scrubber and a condenser recovering head for district heating. Technical solutions were presented as well as location and connection of the heat recovery system with flue gas ducts, DH system and raw water system. Technical and economic analyses were made, as well as project profitability analyses, taking into account environmental issues and grants.

Ministry of Science and Higher Education
2008

Commissioned research project PBZ-MeiN-4/2/2006, research task no. I.2.6/1 „Supercritical coal units – use in cogeneration”Elsamprojekt Polska participated in the project as a member of a consortium consisting of Poland’s leading R&D institutions and technical universities.In the study, a detailed analysis was made of thermodynamic model for 400-800 MW ultra supercritical coal fired units with and without CO2 capture by amine method. Optimisation analysis were carried out, taking into account technical possibilities and economic effectiveness of heat extraction from the unit and of heat recovery from CCS system for district heating purposes.

Vattenfall Heal Poland
2008

Feasibility study of a biomass unit for Siekierki CHP Plant. Analyses of multiple technical alternatives for biomass in the form of wood chips and pellets, gasifier, coal fired boiler conversion to biomass, construction of a new biomass boiler, construction of a new biomass unit, biomass handling systems for 50-300 thousand t/a biomass.

O&M Manual Zajaczkowo Wind Farm
2007

Preparation of Wind Farm Operation and Maintenance Manual, including the requirements for wind farm operator and power grid operator regarding the division of equipment in terms of operation and maintenance, operation of 110/30 kV substation and wind turbine, operation actions, safety principles, co-ordination of operation and maintenance.

BOT Opole Power Plant
2007

Analysis of multiple alternatives of using the auxiliary boiler for renewable power production, including the modernisation of existing grate boilers, a new straw fired boiled, a new wood chips fired boiler, a biomass gasifier cooperating with the unit boiler, concept of including the biomass boiler in the HP regeneration system of 370 MW unit; concepts of biomass handling systems for wood chips, straw, pellets.

ZEW Kogeneracja S.A.
2007-2008

Consulting services in the preparation and implementation phase of the project involving biomass co-firing system for Wroclaw CHP Plant unit 1, including analyses to select the best technical and economic alternative. The selected alternative included co-firing dry biomass (pellets) with approx. 45% energy input, in a pulverised fuel boiler OP230 and a biomass handling system with silos and biomass transport to the boiler. An environmental impact report was prepared for the project, as well as an application for project development conditions. Technical specification was prepared for tendering procedure for the modernisation of boiler OP230 and construction of biomass handling system.The documentation prepared made it possible to select contractors and conclude contracts for the project implementation.

Vattenfall Heat Poland
2007-2008

Analyses regarding the possibility of constructing a new CHP Plant in Grudziądz municipality (kujawsko-pomorskie province). The report presents the concept of a coal fired 2x800 MW ultra supercritical power plant with an open cooling system (water from the Vistula), and alternatively with a closed cooling system with a cooling tower. A preliminary layout of the plant in the area indicated by the Employer was made. External conditions for the project in the suggested location were analysed, including connection to the HV power grid, connection to the road and railway systems, possibilities to take in and discharge post-cooling water, collisions with airway routes. A preliminary analysis of railway and truck transport for the new power plant was made, including agreements with the Polish Railway regarding the construction of a railway siding. A preliminary geotechnical analysis of the location was carried out to determine the conditions for building settlement. A preliminary environmental impact assessment was made for the new power plant, including Nature 2000 and other protected areas. Taking into account the analyses specified above, a general investment budget was prepared for the green-field project with all the accompanying infrastructure in the analysed location.

Vattenfall Heat Poland
2007

Environmental impact assessment report regarding wet desulphurisation plant for Siekierki CHP Plant, preparing application for environmental decision, submission of application to the relevant environmental authorities and negotiations with the authorities. The project obtained environmental decision for constructing the plant.

EC Białystok S.A.
2007

Owners Engineer. The project involves construction of biomass plant for renewable power generation. It includes PF coal fired boiler conversion into a bubbling fluidised bed (BFB) boiler firing biomass similar to wood chips, and construction of complete biomass handling system. Boiler capacity after modernisation 105t/h steam; annual biomass consumption up to 200,000 t.

Vattenfall Heat Poland
2007

Feasibility study of a biomass fired CHP plant in Pruszków near Warsaw. A number of technical and economic alternatives were analysed for the forecast heat demand of approx. 250MWt. Plant capacities from 30 to 70MWe were analysed in various configurations such as one unit with one boiler, one unit with two boilers, or two units. The study also included biomass market analysis and possibilities of organising energy crop plantations.

Gdańskie Przedsiębiorstwo Energetyki Cieplnej
2007

Feasibility study of a cogeneration unit with municipal waste and biomass as main fuel. A number of technical and economic alternatives were analysed for a forecast heat demand of approx. 100MWt. Main alternatives included: Waste-To-Energy project based on unsorted municipal wasted and alternatively energy fraction separated from waste and a biomass installation. Biomass types analysed included straw, pellets and wood chips.

ZEW Kogeneracja S.A.
2007

Study of biomass generation unit at ZEW Kogeneracja S.A.”, aiming to find an optimum technical and economic alternative for using biomass fuel for renewable energy production at Wrocław and Czechnica CHP Plants.

Margonin 120 MWWind Farm
2006

Analysis of renewable energy market in Poland, including evaluation of the present situation and development forecasts (including price projections) for renewable sources.

Vattenfall Heat Poland
2006

Environmental impact report for a project involving construction of a new 480 MWe unit at Siekierki CHP Plant in Warsaw, prepared in order to obtain environmental permit for the project. The report includes the environmental impact of the entire Siekierki CHP Plant after implementing the new unit and the planned environmental systems (flue gas desulphurisation and deNOx plants).

Chemical PlantPolice S.A.
2006

Concept of fuel conversion from fuel oil to natural gas for selected systems of Police Chemical Plant. The work included technical and economic analyses of multiple alternatives for fuel conversion from the currently used mazout and light fuel oil to natural gas. Basing on the economic analysis, which included investments costs, differences in the fuel costs and in the related costs (such as operation costs, environmental costs, maintenance costs), recommended alternatives were presented.

Vattenfall Heat Poland
2006

Preparing FGD plant concept for Siekierki CHP Plant. A concept for FGD and a new chimney stack for Siekierki CHP, for the existing coal-fired units and the planned new unit, including analysis of several alternatives; preparing the application and appendices for the application for issuing construction conditions for the selected alternative; preparing tender documentation, functional programme and the technical part of contract specimen, necessary for public procurement procedure.

Vattenfall Heat Poland
2006

Analysis of possibilities of constructing new units in Poland; the study analysed location conditions for construction of new coal fired and CCGT units, analysis of the existing energy sources and local heat markets, selection of optimal locations for new generation facilities.

Vattenfall Heat Poland
2006

Pre-feasibility study for a construction of a new unit in Warsaw. The analyses covered multiple alternatives of power units from 200 to 700 MWe, sub- and supercritical, of varied heal output. Analyses were made for two possible locations, at Siekierki CHP Plant and at Kawęczyn Heat Plant. Technical and economic optimisation involved incorporation of new facilities into the existing process systems, in compliance with the present and future environmental requirements. The analyses took into account a number of parameters and conditions influencing the optimal selection of recommended alternative, such as combustion technologies, steam parameters, thermal cycle of the plant, concept of district heating part, various cooling solutions involving an open cooling system as well as dry and wet fan cooling towers, plant preparation for the future requirements for CO2 reduction. Thermal cycles of the analysed alternatives were modelled and analysed for a number of loads. As a result of the analyses, supercritical coal-fired units were recommended as optimum solution, for the location of Siekierki - 450 MWe net, for the location of Kawęczyn – 650 MWe.

EC Białystok S.A.
2006

Preparing tender specification for conversion of OP-140 boiler to a biomass fired fluidised bed (BFB) boiler and implementation of biomass handling system at Białystok CHP Plant.

EC Białystok S.A.
2006

Preliminary biomass contracting for Białystok CHP Plant. (approx. demand 200,000 t/a). Preparing letters of intent and a draft of long term biomass purchase agreement to secure interests of both parties, covering technical issues, quality assurance, price development and billing system, organisation and logistics etc. Letters of intent signed as a result of negotiations covered the supply of biomass of various origin in compliance with relevant Polish legislation.

J-Power
2006-2008

Zajączkowo Wind Farm project. Services include preparing tender specification for a wind farm in north-western Poland, consisting of 24 x 2MW. In the implementation phase Elsamprojekt will perform the function of Project Manager.

Elsam A/S
2006-2007

Ostrowo Wind Farm project. Services include preparing tender specification for a wind farm in north-western Poland, consisting of 17 x 1.8 MW wind turbines. In the implementation phase Elsamprojekt will perform the function of Project Manager and will be responsible for Owners Engineer services (electrical systems and civil works) and Project Management.

J-Power
2006

Due diligence and review of documentation for a wind farm to be constructed in northern Poland, carried out for the Investor in order to provide a basis for the final decision on project implementation.

Pekao Access
2006

Due diligence of Łańcut heat plant as part of privatisation process.

Vattenfall
2005

Feasibility study of installing heat accumulator tank at Żerań CHP Plant, WarsawThe study investigated the possibilities of incorporating a heat accumulator in the existing DH system at Żerań CHP Plant. Economic analysis was made for a number of operation modes.

Vattenfall
2005

Technical and economic analysis of installing a steam engine at CHP Pruszków. A number of engine designs were analysed and economic analyses were made for the selected alternatives.

Police Chemical Plant
2005

Pre-project study evaluating economic viability of the projects involving modernisation of turbine-driven compressors of synthesis gas and CO2 turbine in the ammonia and urea production plant.

Elana Energetyka
2005

Technical and economic audit at industrial CHP Plant Elana Energetyka to formulate reorganisation guidelines. The audit included two CHP plants fired with coal and heavy fuel oil, compressed air, cool, nitrogen systems as well as water supply and sewage system.

Radpec
2005

Full feasibility study of waste incineration plant construction in Radom, according to The National Fund for Environmental Protection and Water Management (NFOŚiGW) requirements. Analysis of waste fuel availability, including RDF and sludge; preliminary analysis of technical alternatives of the waste-to-energy plant, producing heat and power in cogeneration – selection of the most attractive solution; economic and financial analysis of the selected alternatives.

Białystok CHP Plant
2005

Modernisation and automation project for Białystok CHP Plant. Elsamprojekt is a Project Manager for the entire project. Automation will be carried out at three CHP units of EC Białystok and will include auxiliary systems.

Vattenfall
2005

Feasibility study of installing heat accumulator tank at Siekierki CHP Plant, WarsawThe study investigated the possibilities of incorporating a heat accumulator in the existing DH system at Siekierki CHP Plant. Economic analysis was made for a number of operation modes. Tender specification for heat accumulator was prepared.

BOT Elektrownia Bełchatów S.A.
2005-2006

Study on location of flue gas desulphurisation plant for units 1 and 2, aimed to select a location optimal form both economic and technical point of view.

Białystok CHP Plant
2005-2006

Feasibility study of boiler coal-to-biomass conversion at Białystok CHP Plant. The study consisted of analysis of the possibilities of supplying timber biomass to Białystok CHP Plant; technical-economical analysis of possibilities of conversion; financial analysis of the investment; environmental impact report to obtain environmental permits.

Vattenfall
2005

Environmental due diligence of Kozienice Power Plant, including necessary environmental investment projects.

PCC AG
2005

Technical and market due diligence of Kozienice Power Plant.

Vattenfall
2005

Environmental due diligence of Bydgoszcz CHP Plant.



PCC AG
2005

Technical and market due diligence for Ostroleka Power Plant Group.



Atex Sp. z o.o
2005

Preliminary feasibility study of a biomass-fired CHP project in Przemysl.



Police Chemical Plant / Access Ltd.
2005

Technical and market due-diligence of Police industrial CHP plant for the Ministry of the Treasury in the privatisation process.



Vattenfall
2005

Environmental due diligence of Zabrze CHP Plant in the privatisation process.



Elsam A/S
2005

Pre-feasibility Study of a Biomass Fired CHP Plant (10-15 MWe with various cogeneration ratios.The analysis covered a number of solutions for biofuels management and logistics. Feasibility of installing a flue gas condenser to recover heat for district heating was analysed as an additional option.

Bialystok CHP Plant
2004

Preliminary feasibility study of a project involving power production based on renewable energy sources.

Hedeselskabet Polska
2004

Development, negotiations and assistance in signing renewable power sale agreements with three power distribution companies.

Elsam A/S
2004

Preliminary feasibility study for a biomass fired CHP (20 MWe and 40 MWt) in the north of Poland.The analysis covered a number of solutions for biofuels management and logistics. Feasibility of installing a flue gas condenser to recover heat for district heating was analysed as an additional option.

Elsam A/S
2004

Due diligence and appraisal of heating company in the north of Poland by discounted planned cash flow method, taking into account extension of the existing generation facilities with a biomass unit. The project also included preliminary analysis as well as technical and economic concept for the biomass unit located at the area of the existing heating plant and connected to the municipal DH system.

Elsam A/S
2004

Assessment of biomass resources accessibility from forest areas and industry in north-eastern Poland.

Rzeszów CHP Plant
2004

Service Contract for Rzeszów CCGT PlantThe project includes preparing tender announcement and a complete tender specification as well as tender evaluation, contract negotiations and drafting a service contract in accordance with the new Public Procurement Law.

PAK
2003-2006

Pątnów II. Elsamprojekt participated in Elsam Engineering project involving review and verification of turn-key contract documentation for the construction of Pątnów II Power Plant, as well as detailed verification of turbine and boiler efficiencies and determining possible optimisation thereof. Plant performance and parameters were compared to similar Danish power plants. Project conformance with UTCE requirements was also verified.

Undisclosed Client
2003

Due diligence services for 37 MW CCGT project in Starachowice, review of fuel supply contracts, EPC contract.

Elektrociepłownie Warszawskie
2003- 2004

Study on EW S.A. (present VHP) development until 2020. The work included analysis of development directions for VHP heat sources until 2020, taking into account internal conditions as well as the changing external factors (such as market conditions, environmental requirements etc.) For the purpose of the study, a uniform dynamic technical and economic model of all heat sources was prepared, including all VHP heat sources, split to generation units. The model allows comparing the analysed development alternatives. The technical model included efficiency data of the existing and new equipment, minimum and maximum generation capacities of turbines and boilers, fuel parameters, emissions and furnace waste production, use of absorbent, water and other consumable media in the existing and new flue gas cleaning installation as well as a dynamic O&M model, taking into account operation hours, investment costs and O&M costs. As a result of the work, possible investment alternatives were presented, including environmental installations for the existing facilities as well as construction of new generation facilities, such as new boilers, new coal-fired CHP units of various capacities, including a large supercritical unit, combined cycle CHP units of 60-250MWe at various locations, small biomass or multi-fuel CHP units.

Rzeszow CHP Plant
2003

Defect Liability Engineer services for CCGT Rzeszow (100 MWe).

Intercell
2003-2004

Concepts for long term energy supply to secure Intercell energy demand.Technical condition of the equipment was assessed, and a concept of constructing a new industrial CHP plant of 50-100 MWe was presented. A number of fuel alternatives and technologies were analysed, using coal or natural gas as primary fuel. Each alternative included also applying waste biomass, sewage sludge and waste wood for power purposes. Possibility of connection to the national power grid was assessed.

Belchatow Power Plant
2003

Turbine Hall Equipment Modernisation Concept Study for units 3-12 in 2007-2015. Technical condition assessment. Modernisation proposals taking into account available modern technologies and implications related to Poland joining EU.

Intercell S.A.
2003

Due-diligence of energy management at the paper mill in Myszków.

Lublin Wrotkow CHP Plant
2002

Defect Liability Engineer services for CCGT Wrotkow (235 MWe).

Elsam A/S
2002-2003

Owner’s Engineer services during the construction of Zagórze Wind Farm (30 MW).Full Owner’s supervision, verification of documentation, take-overs.

Elsam A/S
2002

Consulting services during preparation, negotiations and conclusion of long-term power sale contracts for renewable energy.Consulting services for renewable energy sale in balancing market.

Elsam A/S
2002

Consultancy services during negotiations of conditions of connecting to the power grid, interconnection agreement and transmission agreement for 30MW wind farm.

Sydkraft
2002

Due diligence in STAR-PEC – district heating company in Starogard Gdański.

Undisclosed Client
2002

Market analysis of the energy sector in Poland, including analyses of fuel market, power market and cogeneration market, as well as predictions of fuel and energy prices.

Undisclosed Client
2002

Due diligence study investigating the possibilities for a 30 MW wind farm project in Poland.

AES Horizons Ltd.
2002

Involved preparation of tender materials.Involved in permitting procedures for a 250 MW CCGT project in Żarnowiec, Northern Poland.

Elektrownie Szczytowo-Pompowe S.A.
2001

Concept of a 22 MW wind farm in Loznica, including feasibility study and a application for issuing development conditions.

INTERCELL S.A.
2001

Analysis of alternative heat supply for the paper factory by constructing an industrial CCGT plant (approx. 30 MWe and 140 MWt) or a gas-fired heat plant.

Łęczyńska Energetyka Sp. z o.o.
2001

Feasibility study for an approx. 30 MWe CHP plant with CFB boiler at Bogdanka coal mine, based on coal slurry, waste coal, sludge from sewage treatment plant and municipal waste.

Zielona Góra CHP Plant
2001

Verification of tender documentation for the second stage of tendering procedure for a 190 MWe CCGT CHP plant in Zielona Góra.

Legnica DH Company
2001

Verification of feasibility study for converting the municipal heat plant in Legnica into a CHP plant basing on the existing steam boilers, capacity of approx. 10 MWe.

EC Białystok 4TG
2001

Verification and preparation of tender materials for construction of a 20 MWe condensing turboset at Bialystok CHP Plant.Participation in tender evaluation and selection of the Contractor. The project is based on a number of contracts (turbine set, DCS cooling tower, equipment deliveries).

Undisclosed client
2001

Due Diligence in PEC Slupsk (Slupsk District Heating Company). ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of a heat distribution company as part of privatisation process.The job was performed for a foreign Client.

Undisclosed client
2001

Due Diligence in a large industrial CHP. ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in the preliminary phase of due diligence in an industrial CHP plant to be outsourced from a large industrial plant. The CHP plant, fuelled with hard coal , has a capacity of approx. 100 MWe and approx. 200 MWt. ELSAMPROJEKT scope included evaluation of the process systems, heat demand assessment, analysis of development possibilities of the CHP plant in relation to the entire industrial plant. The job was performed for a foreign Client.

Syndkraft
2001

Due Diligence in Gorzow District Heating Company. ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of a heat distribution company as part of privatisation process. Gorzow Heat Distribution Company (PEC) DH system is the main heat supplier to the town of Gorzow Wielkopolski (population of 126,000). The system is supplied from three heat sources. Total demand for heat is approx. 140 MW, 1000 TJ/year. The scope included technical part of due diligence, in particular technology evaluation, heat market evaluation, development and investment programme assessment, taking into account environmental aspects.

Mott MacDonald / PSEG
2001

Owner’s Engineer services during the construction of Elcho Chorzow CHP plant, 2x102 MWe, including electrical connection and DH connection, Owner’s supervision, technical handover of equipment (incl. Tubines and generators), verification of technical documentation and supervision over transport and hydraulic assembly of turbines.

Gorzów CHP Plant
2001

Verification and preparation of service contract for a CCGT plant.

Opole Power Plant
2000-2001

Technical and economic assessment of “Technical conditions for Opole Power Plant connection to Opole municipality DH network” issued by ECO S.AThe analysis included influence of design temperatures, pressure and regulation method (quality or quantity) on feasibility of supplying 200 MWt heat from 18K360 turbine extractions to DH network of Opole by a planned DH pipeline of 9 km.

Zielona Gora CHPSydkraft
2001

Technical Due Diligence in the CHP privatisation process, on behalf of Sydkraft.ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of Zielona Góra CHP Plant (238MWt, 22.5 MWe, hard-coal fired) as part of privatisation process. ELSAMPROJEKT scope included all the technical issues, such as evaluation of the process systems at the plant, power and heat market evaluation, cost and price structure analysis, development programme analysis including the planned extension of CHP plant with a 190MWe CCGT unit.

Rzeszów CHP Plant
2000-2003

Owner’s Engineer services for new CCGT Rzeszów (98 MWe), Owner’s supervision, technical take-overs of equipment, including turbines and generators, verification of technical documentation, commissioning supervision and handovers.

Wrotków CHP Plant
2000-2002

Owner’s Engineer services for new CCGT Wrotków (235 MWe), Owner’s supervision, technical take-overs of equipment, including turbines and generators, verification of technical documentation, commissioning supervision and handovers.

Bank Pekao S.A.
2000

Independent Technical Advisor to the bank for the implementation of new CCGT Wrotków (235 MWe).

Colombo Power (Private) Limited
2000

Technical supervisory services to certify, witness and review performances tests and commissioning for 60 MW barge-mounted power plant in Sri Lanka, built by Mitsui Engineering & Shipbuilding Co. Ltd., Japan, consisting of 4 diesel generators. Reporting.

Vattenfall Poland
2000

Participation in Tech-wise A/S study “Optimisation and development of Warsaw district heating system”.

Vattenfall Poland
2000

Assistance to a due diligence team in connection with privatisation of GZE S.A. for one of potential investors Site visits at HV/MV stations and MV/LV substations owned by GZE.

Rzeszów CHP Plant
2000

Drafting of Maintenance Agreement for new CCGT Rzeszów (95 MWe).

Opole Power Plant
2000

Tender specification and offer evaluation for turbine modernisation and preparation of heat extraction. For three 18K360 turbines with a capacity of 360 MWe each.

PSE (Polish Power Grid Company)
1999-2000

Report on development of small-scale gas-fired cogeneration plants in European countries.

Ministry of the Treasury, Access Ltd.
1999

Participation in Wybrzeże CHP Group (Gdańsk) privatisation process. Elsamprojekt’s tasks included:Technical assessment and value estimation of CHP buildings and equipment.Market analysis and Wybrzeże’s position, including power and heat price projection until 2010.Assessment of Wybrzeże technology as compared to Polish and international conditions.

Vattenfall Poland Sp. z o.o.
1999

Technical Advisor in the privatisation team for Warsaw CHP Plants (Elektrociepłownie Warszawskie S.A.). Services included:Technical Due Diligence of the plants;Development potential forecast, including risk evaluation;Collecting input data for the model of power and heat production balance;Company structure assessment.

Rzeszów CHP Plant
1999

Preparation and verification of tender specification for EC Rzeszów CCGT (95 MWe);Tender evaluation.Contract negotiations.The tender was prepared based on Public Procurement Law.

PAK Power Stations Group
1999

Ultra Super Critical steam parameters. Optimisation study for Pątnów II Power Project.

Undisclosed Client
1999

Technical due diligence of an industrial CHP plant at the fat processing factory in Brzeg.

Undisclosed Client
1999

Assessment of environmental issues regarding aluminium foundry at the Kety Metal Processing Factory.

Zamojska Spółka ElektroenergetycznaEastern Generation
1998

Preparation of full tender documentation for turn-key project involving construction of 100-120 MW CCGT plant in Jarosław. Participation in negotiations with Polish Oil and Gas Company (PGNiG) and distribution company.

Opole Power Plant
1997-1998

Rationalization and availability studyELSAMPROJEKT made a review of company structure and investigated possibilities of employment reductions at Opole Power Plant so as to improve the organisation, operation mode and employment following the example of a comparable foreign (Danish) power plant.

Enron
1998

For the 120 MW industrial combined cycle plant to be erected in Nowa Sarzyna, ELSAMPROJEKT support the investor with Site Manager and site supervisors for the erection and commissioning of the plant, including connection to the grid.

Swe-Pol Link
1998

The 300 MW HVDC project between Poland and Sweden. Site supervision on behalf of the investor.

Undisclosed client
1998

Due diligence study for 10 MW windfarm project in Poland. Activities included production estimate for the windfarm, investment cost, energy pricing, ownership structure and assessment of the economy.

Kobo
1998-1999

A feasibility study analysing construction of a CHP plant (30 MWe, 60 MWt) with fluidised bed boilers at Bogdanka coal mine, using waste coal from the mine.The study also analysed the possibility to cover heat demand of neighbouring towns by the new CHP plant.

Energoinwest Białystok
1998-1999

Feasibility study for modernisation of Fasty CHP plant in Bialystok, covering usage of sludge from the municipal sewage treatment plant as fuel for the boilers of the CHP plant.The feasibility study will cover technical solutions as well as economic and financial issues related to finding short term as well as long term solutions for the CHP plant and the municipal sewage treatment plant. Issues related to combustion of sewage sludge were an essential part of the study.

ABB Sweden
1998

Construction permit for HVDC cable project between Poland and Sweden. Authorisation of civil design.

Starogard Gdański Polpharma S.A.Vattenfall Poland Sp. z o.o.
1998

Co-operation with Vattenfall in connection with commissioning of new fluidised boilers at industrial CHP owned by Polpharma pharmaceutical plant.

ChełmZamojska Spółka ElektroenergetycznaEastern Generation Ltd.
1998

Feasibility study of a CHP unit for the city of Chełm. Analysed alternatives included a 60 MWe gas fired combined cycle plant, as well as 60 MWe coal fired CFB and PC boiler plants. The issue of utilising waste coal from the nearby Bogdanka coal mine was discussed in detail.

Opole Power Plant
1997-1998

Analysis researching the possibilities of introducing technical and organisational changes at Opole Power Plant, to improve and rationalise its operation. The coal﷓fired power plant consists of 4 equal units with a capacity of approx. 350 MWe and is one of Poland's most modern power plants. Technical benchmarking with Danish power plants.Analysis researching the possibilities of introducing technical and organisational changes at Opole Power Plant, to improve and rationalise its operation. The coal﷓fired power plant consists of 4 equal units with a capacity of approx. 350 MWe and is one of Poland's most modern power plants. Technical benchmarking with Danish power plants.

Bełchatów II Power Plant Management
1997

Independent expert opinion for the study on super critical parameters and optimisation of unit capacity for Bełchatów II.


Kostrzyn Paper MillVattenfall PolandSp. z o.o.
1997

Feasibility study covering rehabilitation of an industrial CHP plant at Kostrzyn Paper Mill.The study covered analysis of heat and power demand and a technical assessment of the existing equipment. The alternatives analysed included combined cycle alternative consisting of gas turbines and waste heat recovery boilers with supplementary firing, each with a capacity of 70 ton/h steam.Preparation of full tender documentation for modernisation of the existing and erection of two new gas fired boilers. Tendering procedure and selection of Contractor.

Elektrociepłownia Zielona Góra S.A.Danish Energy AgencyPartner: DPC.
1995-1998

Preliminary feasibility study for modernisation Zielona Góra CHP Plant. The project was grant supported by the Danish Energy Agency and co-financed by EC Zielona Góra.The project included determining the heat, steam and electricity demand. A number of plant concepts were analysed such as biomass fired boiler and gas fired combined cycle plants. The use of domestic low calorific gas was analysed. A combined cycle plant with a capacity on 100 MWe based on domestic gas was analysed in details covering technical, economic as well as financial matters including defining security package covering off-take contracts.

Zespół Elektrowni Ostrołęka
1994-1995

Feasibility study for modernisation of Ostrołęka A CHP plant. The following alternatives were investigated: rehabilitation of existing CHP, district heating extraction from power plant Ostrołęka B, new coal fired CFB CHP, new combined cycle gas fired CHP. The coal fired CFB and the gas fired Combined Cycle plant were selected as the most attractive solutions and detailed financial analysis were prepared for these alternatives.

Zespół Elektrowni Ostrołęka
1995-1995

Pre-feasibility study of bark firing at Ostrołęka A CHP Plant.The following alternatives were investigated: new multifuel CFB boiler, additional furnace to the existing boilers, new Bubbling Fluidized Bed (BFB) boiler, retrofit of the existing PC boiler to BFB bark firing boiler. The latter alternative was implemented. ELSAMPROJEKT prepared investment package, and long-term fuel supply contract, implementation study, detailed tender specification, and contract with main contractor.

Zespół Elektrociepłowni Bielsko-Biała SAThe European Bank for Reconstruction and Development
1995-1995

Owner’s Engineer services for EBRD during the construction of a turn-key project involving the construction of 55 MW CHP unit. The project was subsidised by the European Bank for Reconstruction and Development.

Polskie Sieci Elektroenergetyczne S.A.Danish Environmental Protection Agency
1993 - 1994

Technical Assistance to Polish Power Grid Company (PSE)Preparation of a study "Potential of priority and CHP Development in Poland" for the Polskie Sieci Elektroenergetyczne (Polish Power Grid Company).In 1992 PSE agreed with the World Bank to initiate a least cost plan for the development and rehabilitation of the Polish power plants. Part of this study is an analysis of the potential for development of cogeneration on the basis of existing and new power plants.

ABB Power Generation, Baden, Switzerland
1995-1995

Technical Assistance in connection with TEP1 at Turów Power Station.In cooperation with Ahlstrom PyroPower (USA) ABB Power Generation was awarded the contract to rehabilitate up to six units of the Polish lignite-fired 2000 MW power station in Turów. The rehabilitated units were supplied with new turbines/generators and new CFB boilers. The capacity of each unit is 230 MWe.Prior to the rehabilitation, a Technical Evaluation Package (TEP1) was carried out in order to determine how much of the existing installation could be reused under the new conditions.