EC Białystok S.A
2008
|
Concept of a heat recovery
system from flues gas condensation for a 75 MW boiler fired with
biomass (fuel humidity approx. 40%). The study presented multiple
alternatives for the 13-15 MW system consisting of a scrubber and a
condenser recovering head for district heating. Technical solutions
were presented as well as location and connection of the heat recovery
system with flue gas ducts, DH system and raw water system. Technical
and economic analyses were made, as well as project profitability
analyses, taking into account environmental issues and grants.
|
|
Ministry of Science and Higher
Education
2008
|
Commissioned research project
PBZ-MeiN-4/2/2006, research task no. I.2.6/1 „Supercritical
coal units – use in cogeneration”Elsamprojekt
Polska participated in the project as a member of a consortium
consisting of Poland’s leading R&D institutions and
technical universities.In the study, a detailed analysis was made of
thermodynamic model for 400-800 MW ultra supercritical coal fired units
with and without CO2 capture by amine method. Optimisation analysis
were carried out, taking into account technical possibilities and
economic effectiveness of heat extraction from the unit and of heat
recovery from CCS system for district heating purposes.
|
|
Vattenfall Heal Poland
2008
|
Feasibility study of a biomass
unit for Siekierki CHP Plant. Analyses of multiple technical
alternatives for biomass in the form of wood chips and pellets,
gasifier, coal fired boiler conversion to biomass, construction of a
new biomass boiler, construction of a new biomass unit, biomass
handling systems for 50-300 thousand t/a biomass.
|
|
O&M Manual Zajaczkowo
Wind Farm
2007
|
Preparation of Wind Farm
Operation and Maintenance Manual, including the requirements for wind
farm operator and power grid operator regarding the division of
equipment in terms of operation and maintenance, operation of 110/30 kV
substation and wind turbine, operation actions, safety principles,
co-ordination of operation and maintenance.
|
|
BOT Opole Power Plant
2007
|
Analysis of multiple
alternatives of using the auxiliary boiler for renewable power
production, including the modernisation of existing grate boilers, a
new straw fired boiled, a new wood chips fired boiler, a biomass
gasifier cooperating with the unit boiler, concept of including the
biomass boiler in the HP regeneration system of 370 MW unit; concepts
of biomass handling systems for wood chips, straw, pellets.
|
|
ZEW Kogeneracja S.A.
2007-2008
|
Consulting services in the
preparation and implementation phase of the project involving biomass
co-firing system for Wroclaw CHP Plant unit 1, including analyses to
select the best technical and economic alternative. The selected
alternative included co-firing dry biomass (pellets) with approx. 45%
energy input, in a pulverised fuel boiler OP230 and a biomass handling
system with silos and biomass transport to the boiler. An environmental
impact report was prepared for the project, as well as an application
for project development conditions. Technical specification was
prepared for tendering procedure for the modernisation of boiler OP230
and construction of biomass handling system.The documentation prepared
made it possible to select contractors and conclude contracts for the
project implementation.
|
|
Vattenfall Heat Poland
2007-2008
|
Analyses regarding the
possibility of constructing a new CHP Plant in Grudziądz municipality
(kujawsko-pomorskie province). The report presents the concept of a
coal fired 2x800 MW ultra supercritical power plant with an open
cooling system (water from the Vistula), and alternatively with a
closed cooling system with a cooling tower. A preliminary layout of the
plant in the area indicated by the Employer was made. External
conditions for the project in the suggested location were analysed,
including connection to the HV power grid, connection to the road and
railway systems, possibilities to take in and discharge post-cooling
water, collisions with airway routes. A preliminary analysis of railway
and truck transport for the new power plant was made, including
agreements with the Polish Railway regarding the construction of a
railway siding. A preliminary geotechnical analysis of the location was
carried out to determine the conditions for building settlement. A
preliminary environmental impact assessment was made for the new power
plant, including Nature 2000 and other protected areas. Taking into
account the analyses specified above, a general investment budget was
prepared for the green-field project with all the accompanying
infrastructure in the analysed location.
|
|
Vattenfall Heat Poland
2007
|
Environmental impact
assessment report regarding wet desulphurisation plant for Siekierki
CHP Plant, preparing application for environmental decision, submission
of application to the relevant environmental authorities and
negotiations with the authorities. The project obtained environmental
decision for constructing the plant.
|
|
EC Białystok S.A.
2007
|
Owners Engineer. The project
involves construction of biomass plant for renewable power generation.
It includes PF coal fired boiler conversion into a bubbling fluidised
bed (BFB) boiler firing biomass similar to wood chips, and construction
of complete biomass handling system. Boiler capacity after
modernisation 105t/h steam; annual biomass consumption up to 200,000 t.
|
|
Vattenfall Heat Poland
2007
|
Feasibility study of a biomass
fired CHP plant in Pruszków near Warsaw. A number of
technical and economic alternatives were analysed for the forecast heat
demand of approx. 250MWt. Plant capacities from 30 to 70MWe were
analysed in various configurations such as one unit with one boiler,
one unit with two boilers, or two units. The study also included
biomass market analysis and possibilities of organising energy crop
plantations.
|
|
Gdańskie Przedsiębiorstwo
Energetyki Cieplnej
2007
|
Feasibility study of a
cogeneration unit with municipal waste and biomass as main fuel. A
number of technical and economic alternatives were analysed for a
forecast heat demand of approx. 100MWt. Main alternatives included:
Waste-To-Energy project based on unsorted municipal wasted and
alternatively energy fraction separated from waste and a biomass
installation. Biomass types analysed included straw, pellets and wood
chips.
|
|
ZEW Kogeneracja S.A.
2007
|
Study of biomass generation
unit at ZEW Kogeneracja S.A.”, aiming to find an optimum
technical and economic alternative for using biomass fuel for renewable
energy production at Wrocław and Czechnica CHP Plants.
|
|
Margonin 120 MWWind Farm
2006
|
Analysis of renewable energy
market in Poland, including evaluation of the present situation and
development forecasts (including price projections) for renewable
sources.
|
|
Vattenfall Heat Poland
2006
|
Environmental impact report
for a project involving construction of a new 480 MWe unit at Siekierki
CHP Plant in Warsaw, prepared in order to obtain environmental permit
for the project. The report includes the environmental impact of the
entire Siekierki CHP Plant after implementing the new unit and the
planned environmental systems (flue gas desulphurisation and deNOx
plants).
|
|
Chemical PlantPolice S.A.
2006
|
Concept of fuel conversion
from fuel oil to natural gas for selected systems of Police Chemical
Plant. The work included technical and economic analyses of multiple
alternatives for fuel conversion from the currently used mazout and
light fuel oil to natural gas. Basing on the economic analysis, which
included investments costs, differences in the fuel costs and in the
related costs (such as operation costs, environmental costs,
maintenance costs), recommended alternatives were presented.
|
|
Vattenfall Heat Poland
2006
|
Preparing FGD plant concept
for Siekierki CHP Plant. A concept for FGD and a new chimney stack for
Siekierki CHP, for the existing coal-fired units and the planned new
unit, including analysis of several alternatives; preparing the
application and appendices for the application for issuing construction
conditions for the selected alternative; preparing tender
documentation, functional programme and the technical part of contract
specimen, necessary for public procurement procedure.
|
|
Vattenfall Heat Poland
2006
|
Analysis of possibilities of
constructing new units in Poland; the study analysed location
conditions for construction of new coal fired and CCGT units, analysis
of the existing energy sources and local heat markets, selection of
optimal locations for new generation facilities.
|
|
Vattenfall Heat Poland
2006
|
Pre-feasibility study for a
construction of a new unit in Warsaw. The analyses covered multiple
alternatives of power units from 200 to 700 MWe, sub- and
supercritical, of varied heal output. Analyses were made for two
possible locations, at Siekierki CHP Plant and at Kawęczyn Heat Plant.
Technical and economic optimisation involved incorporation of new
facilities into the existing process systems, in compliance with the
present and future environmental requirements. The analyses took into
account a number of parameters and conditions influencing the optimal
selection of recommended alternative, such as combustion technologies,
steam parameters, thermal cycle of the plant, concept of district
heating part, various cooling solutions involving an open cooling
system as well as dry and wet fan cooling towers, plant preparation for
the future requirements for CO2 reduction. Thermal cycles of the
analysed alternatives were modelled and analysed for a number of loads.
As a result of the analyses, supercritical coal-fired units were
recommended as optimum solution, for the location of Siekierki - 450
MWe net, for the location of Kawęczyn – 650 MWe.
|
|
EC Białystok S.A.
2006
|
Preparing tender specification
for conversion of OP-140 boiler to a biomass fired fluidised bed (BFB)
boiler and implementation of biomass handling system at Białystok CHP
Plant.
|
|
EC Białystok S.A.
2006
|
Preliminary biomass
contracting for Białystok CHP Plant. (approx. demand 200,000 t/a).
Preparing letters of intent and a draft of long term biomass purchase
agreement to secure interests of both parties, covering technical
issues, quality assurance, price development and billing system,
organisation and logistics etc. Letters of intent signed as a result of
negotiations covered the supply of biomass of various origin in
compliance with relevant Polish legislation.
|
|
J-Power
2006-2008
|
Zajączkowo Wind Farm project.
Services include preparing tender specification for a wind farm in
north-western Poland, consisting of 24 x 2MW. In the implementation
phase Elsamprojekt will perform the function of Project Manager.
|
|
Elsam A/S
2006-2007
|
Ostrowo Wind Farm project.
Services include preparing tender specification for a wind farm in
north-western Poland, consisting of 17 x 1.8 MW wind turbines. In the
implementation phase Elsamprojekt will perform the function of Project
Manager and will be responsible for Owners Engineer services
(electrical systems and civil works) and Project Management.
|
|
J-Power
2006
|
Due diligence and review of
documentation for a wind farm to be constructed in northern Poland,
carried out for the Investor in order to provide a basis for the final
decision on project implementation.
|
|
Pekao Access
2006
|
Due diligence of Łańcut heat
plant as part of privatisation process.
|
|
Vattenfall
2005
|
Feasibility study of
installing heat accumulator tank at Żerań CHP Plant, WarsawThe study
investigated the possibilities of incorporating a heat accumulator in
the existing DH system at Żerań CHP Plant. Economic analysis was made
for a number of operation modes.
|
|
Vattenfall
2005
|
Technical and economic
analysis of installing a steam engine at CHP Pruszków. A
number of engine designs were analysed and economic analyses were made
for the selected alternatives.
|
|
Police Chemical Plant
2005
|
Pre-project study evaluating
economic viability of the projects involving modernisation of
turbine-driven compressors of synthesis gas and CO2 turbine in the
ammonia and urea production plant.
|
|
Elana Energetyka
2005
|
Technical and economic audit
at industrial CHP Plant Elana Energetyka to formulate reorganisation
guidelines. The audit included two CHP plants fired with coal and heavy
fuel oil, compressed air, cool, nitrogen systems as well as water
supply and sewage system.
|
|
Radpec
2005
|
Full feasibility study of
waste incineration plant construction in Radom, according to The
National Fund for Environmental Protection and Water Management
(NFOŚiGW) requirements. Analysis of waste fuel availability, including
RDF and sludge; preliminary analysis of technical alternatives of the
waste-to-energy plant, producing heat and power in cogeneration
– selection of the most attractive solution; economic and
financial analysis of the selected alternatives.
|
|
Białystok CHP Plant
2005
|
Modernisation and automation
project for Białystok CHP Plant. Elsamprojekt is a Project Manager for
the entire project. Automation will be carried out at three CHP units
of EC Białystok and will include auxiliary systems.
|
|
Vattenfall
2005
|
Feasibility study of
installing heat accumulator tank at Siekierki CHP Plant, WarsawThe
study investigated the possibilities of incorporating a heat
accumulator in the existing DH system at Siekierki CHP Plant. Economic
analysis was made for a number of operation modes. Tender specification
for heat accumulator was prepared.
|
|
BOT Elektrownia
Bełchatów S.A.
2005-2006
|
Study on location of flue gas
desulphurisation plant for units 1 and 2, aimed to select a location
optimal form both economic and technical point of view.
|
|
Białystok CHP Plant
2005-2006
|
Feasibility study of boiler
coal-to-biomass conversion at Białystok CHP Plant. The study consisted
of analysis of the possibilities of supplying timber biomass to
Białystok CHP Plant; technical-economical analysis of possibilities of
conversion; financial analysis of the investment; environmental impact
report to obtain environmental permits.
|
|
Vattenfall
2005
|
Environmental due diligence of
Kozienice Power Plant, including necessary environmental investment
projects.
|
|
PCC AG
2005
|
Technical and market due
diligence of Kozienice Power Plant.
|
|
Vattenfall
2005
|
Environmental due diligence of
Bydgoszcz CHP Plant.
|
|
PCC AG
2005
|
Technical and market due
diligence for Ostroleka Power Plant Group.
|
|
Atex Sp. z o.o
2005
|
Preliminary feasibility study
of a biomass-fired CHP project in Przemysl.
|
|
Police Chemical Plant / Access
Ltd.
2005
|
Technical and market
due-diligence of Police industrial CHP plant for the Ministry of the
Treasury in the privatisation process.
|
|
Vattenfall
2005
|
Environmental due diligence of
Zabrze CHP Plant in the privatisation process.
|
|
Elsam A/S
2005
|
Pre-feasibility Study of a
Biomass Fired CHP Plant (10-15 MWe with various cogeneration ratios.The
analysis covered a number of solutions for biofuels management and
logistics. Feasibility of installing a flue gas condenser to recover
heat for district heating was analysed as an additional option.
|
|
Bialystok CHP Plant
2004
|
Preliminary feasibility study
of a project involving power production based on renewable energy
sources.
|
|
Hedeselskabet Polska
2004
|
Development, negotiations and
assistance in signing renewable power sale agreements with three power
distribution companies.
|
|
Elsam A/S
2004
|
Preliminary feasibility study
for a biomass fired CHP (20 MWe and 40 MWt) in the north of Poland.The
analysis covered a number of solutions for biofuels management and
logistics. Feasibility of installing a flue gas condenser to recover
heat for district heating was analysed as an additional option.
|
|
Elsam A/S
2004
|
Due diligence and appraisal of
heating company in the north of Poland by discounted planned cash flow
method, taking into account extension of the existing generation
facilities with a biomass unit. The project also included preliminary
analysis as well as technical and economic concept for the biomass unit
located at the area of the existing heating plant and connected to the
municipal DH system.
|
|
Elsam A/S
2004
|
Assessment of biomass
resources accessibility from forest areas and industry in north-eastern
Poland.
|
|
Rzeszów CHP Plant
2004
|
Service Contract for
Rzeszów CCGT PlantThe project includes preparing tender
announcement and a complete tender specification as well as tender
evaluation, contract negotiations and drafting a service contract in
accordance with the new Public Procurement Law.
|
|
PAK
2003-2006
|
Pątnów II.
Elsamprojekt participated in Elsam Engineering project involving review
and verification of turn-key contract documentation for the
construction of Pątnów II Power Plant, as well as detailed
verification of turbine and boiler efficiencies and determining
possible optimisation thereof. Plant performance and parameters were
compared to similar Danish power plants. Project conformance with UTCE
requirements was also verified.
|
|
Undisclosed Client
2003
|
Due diligence services for 37
MW CCGT project in Starachowice, review of fuel supply contracts, EPC
contract.
|
|
Elektrociepłownie Warszawskie
2003- 2004
|
Study on EW S.A. (present VHP)
development until 2020. The work included analysis of development
directions for VHP heat sources until 2020, taking into account
internal conditions as well as the changing external factors (such as
market conditions, environmental requirements etc.) For the purpose of
the study, a uniform dynamic technical and economic model of all heat
sources was prepared, including all VHP heat sources, split to
generation units. The model allows comparing the analysed development
alternatives. The technical model included efficiency data of the
existing and new equipment, minimum and maximum generation capacities
of turbines and boilers, fuel parameters, emissions and furnace waste
production, use of absorbent, water and other consumable media in the
existing and new flue gas cleaning installation as well as a dynamic
O&M model, taking into account operation hours, investment
costs and O&M costs. As a result of the work, possible
investment alternatives were presented, including environmental
installations for the existing facilities as well as construction of
new generation facilities, such as new boilers, new coal-fired CHP
units of various capacities, including a large supercritical unit,
combined cycle CHP units of 60-250MWe at various locations, small
biomass or multi-fuel CHP units.
|
|
Rzeszow CHP Plant
2003
|
Defect Liability Engineer
services for CCGT Rzeszow (100 MWe).
|
|
Intercell
2003-2004
|
Concepts for long term energy
supply to secure Intercell energy demand.Technical condition of the
equipment was assessed, and a concept of constructing a new industrial
CHP plant of 50-100 MWe was presented. A number of fuel alternatives
and technologies were analysed, using coal or natural gas as primary
fuel. Each alternative included also applying waste biomass, sewage
sludge and waste wood for power purposes. Possibility of connection to
the national power grid was assessed.
|
|
Belchatow Power Plant
2003
|
Turbine Hall Equipment
Modernisation Concept Study for units 3-12 in 2007-2015. Technical
condition assessment. Modernisation proposals taking into account
available modern technologies and implications related to Poland
joining EU.
|
|
Intercell S.A.
2003
|
Due-diligence of energy
management at the paper mill in Myszków.
|
|
Lublin Wrotkow CHP Plant
2002
|
Defect Liability Engineer
services for CCGT Wrotkow (235 MWe).
|
|
Elsam A/S
2002-2003
|
Owner’s Engineer
services during the construction of Zagórze Wind Farm (30
MW).Full Owner’s supervision, verification of documentation,
take-overs.
|
|
Elsam A/S
2002
|
Consulting services during
preparation, negotiations and conclusion of long-term power sale
contracts for renewable energy.Consulting services for renewable energy
sale in balancing market.
|
|
Elsam A/S
2002
|
Consultancy services during
negotiations of conditions of connecting to the power grid,
interconnection agreement and transmission agreement for 30MW wind farm.
|
|
Sydkraft
2002
|
Due diligence in STAR-PEC
– district heating company in Starogard Gdański.
|
|
Undisclosed Client
2002
|
Market analysis of the energy
sector in Poland, including analyses of fuel market, power market and
cogeneration market, as well as predictions of fuel and energy prices.
|
|
Undisclosed Client
2002
|
Due diligence study
investigating the possibilities for a 30 MW wind farm project in Poland.
|
|
AES Horizons Ltd.
2002
|
Involved preparation of tender
materials.Involved in permitting procedures for a 250 MW CCGT project
in Żarnowiec, Northern Poland.
|
|
Elektrownie Szczytowo-Pompowe
S.A.
2001
|
Concept of a 22 MW wind farm
in Loznica, including feasibility study and a application for issuing
development conditions.
|
|
INTERCELL S.A.
2001
|
Analysis
of alternative heat supply for the paper factory by constructing an
industrial CCGT plant (approx. 30 MWe and 140 MWt) or a gas-fired heat
plant.
|
|
Łęczyńska Energetyka Sp. z o.o.
2001
|
Feasibility
study for an approx. 30 MWe CHP plant with CFB boiler at Bogdanka coal
mine, based on coal slurry, waste coal, sludge from sewage treatment
plant and municipal waste.
|
|
Zielona Góra CHP
Plant
2001
|
Verification
of tender documentation for the second stage of tendering procedure for
a 190 MWe CCGT CHP plant in Zielona Góra.
|
|
Legnica DH Company
2001
|
Verification
of feasibility study for converting the municipal heat plant in Legnica
into a CHP plant basing on the existing steam boilers, capacity of
approx. 10 MWe.
|
|
EC Białystok 4TG
2001
|
Verification
and preparation of tender materials for construction of a 20 MWe
condensing turboset at Bialystok CHP Plant.Participation in tender
evaluation and selection of the Contractor. The project is based on a
number of contracts (turbine set, DCS cooling tower, equipment
deliveries).
|
|
Undisclosed
client
2001
|
Due Diligence in PEC Slupsk
(Slupsk District Heating Company). ELSAMPROJEKT provided consultancy
engineering services for one of the potential investors in a due
diligence of a heat distribution company as part of privatisation
process.The job was performed for a foreign Client.
|
|
Undisclosed
client
2001
|
Due Diligence in a large
industrial CHP. ELSAMPROJEKT provided consultancy engineering services
for one of the potential investors in the preliminary phase of due
diligence in an industrial CHP plant to be outsourced from a large
industrial plant. The CHP plant, fuelled with hard coal , has a
capacity of approx. 100 MWe and approx. 200 MWt. ELSAMPROJEKT scope
included evaluation of the process systems, heat demand assessment,
analysis of development possibilities of the CHP plant in relation to
the entire industrial plant. The job was performed for a foreign Client.
|
|
Syndkraft
2001
|
Due Diligence in Gorzow
District Heating Company. ELSAMPROJEKT provided consultancy engineering
services for one of the potential investors in a due diligence of a
heat distribution company as part of privatisation process. Gorzow Heat
Distribution Company (PEC) DH system is the main heat supplier to the
town of Gorzow Wielkopolski (population of 126,000). The system is
supplied from three heat sources. Total demand for heat is approx. 140
MW, 1000 TJ/year. The scope included technical part of due diligence,
in particular technology evaluation, heat market evaluation,
development and investment programme assessment, taking into account
environmental aspects.
|
|
Mott
MacDonald / PSEG
2001
|
Owner’s Engineer
services during the construction of Elcho Chorzow CHP plant, 2x102 MWe,
including electrical connection and DH connection, Owner’s
supervision, technical handover of equipment (incl. Tubines and
generators), verification of technical documentation and supervision
over transport and hydraulic assembly of turbines.
|
|
Gorzów
CHP Plant
2001
|
Verification and preparation
of service contract for a CCGT plant.
|
|
Opole
Power Plant
2000-2001
|
Technical and economic
assessment of “Technical conditions for Opole Power Plant
connection to Opole municipality DH network” issued by ECO
S.AThe analysis included influence of design temperatures, pressure and
regulation method (quality or quantity) on feasibility of supplying 200
MWt heat from 18K360 turbine extractions to DH network of Opole by a
planned DH pipeline of 9 km.
|
|
Zielona Gora CHPSydkraft
2001
|
Technical
Due Diligence in the CHP privatisation process, on behalf of
Sydkraft.ELSAMPROJEKT provided consultancy engineering services for one
of the potential investors in a due diligence of Zielona
Góra CHP Plant (238MWt, 22.5 MWe, hard-coal fired) as part
of privatisation process. ELSAMPROJEKT scope included all the technical
issues, such as evaluation of the process systems at the plant, power
and heat market evaluation, cost and price structure analysis,
development programme analysis including the planned extension of CHP
plant with a 190MWe CCGT unit.
|
|
Rzeszów CHP Plant
2000-2003
|
Owner’s
Engineer services for new CCGT Rzeszów (98 MWe),
Owner’s supervision, technical take-overs of equipment,
including turbines and generators, verification of technical
documentation, commissioning supervision and handovers.
|
|
Wrotków CHP Plant
2000-2002
|
Owner’s
Engineer services for new CCGT Wrotków (235 MWe),
Owner’s supervision, technical take-overs of equipment,
including turbines and generators, verification of technical
documentation, commissioning supervision and handovers.
|
|
Bank Pekao S.A.
2000
|
Independent
Technical Advisor to the bank for the implementation of new CCGT
Wrotków (235 MWe).
|
|
Colombo Power (Private) Limited
2000
|
Technical
supervisory services to certify, witness and review performances tests
and commissioning for 60 MW barge-mounted power plant in Sri Lanka,
built by Mitsui Engineering & Shipbuilding Co. Ltd., Japan,
consisting of 4 diesel generators. Reporting.
|
|
Vattenfall Poland
2000
|
Participation
in Tech-wise A/S study “Optimisation and development of
Warsaw district heating system”.
|
|
Vattenfall Poland
2000
|
Assistance to a due diligence
team in connection with privatisation of GZE S.A. for one of potential
investors Site visits at HV/MV stations and MV/LV substations owned by
GZE.
|
|
Rzeszów CHP Plant
2000
|
Drafting of Maintenance
Agreement for new CCGT Rzeszów (95 MWe).
|
|
Opole Power Plant
2000
|
Tender specification and offer
evaluation for turbine modernisation and preparation of heat
extraction. For three 18K360 turbines with a capacity of 360 MWe each.
|
|
PSE (Polish Power Grid Company)
1999-2000
|
Report on development of
small-scale gas-fired cogeneration plants in European countries.
|
|
Ministry of the Treasury,
Access Ltd.
1999
|
Participation in Wybrzeże CHP
Group (Gdańsk) privatisation process. Elsamprojekt’s tasks
included:Technical assessment and value estimation of CHP buildings and
equipment.Market analysis and Wybrzeże’s position, including
power and heat price projection until 2010.Assessment of Wybrzeże
technology as compared to Polish and international conditions.
|
|
Vattenfall Poland Sp. z o.o.
1999
|
Technical Advisor in the
privatisation team for Warsaw CHP Plants (Elektrociepłownie Warszawskie
S.A.). Services included:Technical Due Diligence of the
plants;Development potential forecast, including risk
evaluation;Collecting input data for the model of power and heat
production balance;Company structure assessment.
|
|
Rzeszów CHP Plant
1999
|
Preparation and verification
of tender specification for EC Rzeszów CCGT (95 MWe);Tender
evaluation.Contract negotiations.The tender was prepared based on
Public Procurement Law.
|
|
PAK Power Stations Group
1999
|
Ultra Super Critical steam
parameters. Optimisation study for Pątnów II Power Project.
|
|
Undisclosed Client
1999
|
Technical due diligence of an
industrial CHP plant at the fat processing factory in Brzeg.
|
|
Undisclosed Client
1999
|
Assessment of environmental
issues regarding aluminium foundry at the Kety Metal Processing Factory.
|
|
Zamojska Spółka
ElektroenergetycznaEastern Generation
1998
|
Preparation of full tender
documentation for turn-key project involving construction of 100-120 MW
CCGT plant in Jarosław. Participation in negotiations with Polish Oil
and Gas Company (PGNiG) and distribution company.
|
|
Opole Power Plant
1997-1998
|
Rationalization and
availability studyELSAMPROJEKT made a review of company structure and
investigated possibilities of employment reductions at Opole Power
Plant so as to improve the organisation, operation mode and employment
following the example of a comparable foreign (Danish) power plant.
|
|
Enron
1998
|
For the 120 MW industrial
combined cycle plant to be erected in Nowa Sarzyna, ELSAMPROJEKT
support the investor with Site Manager and site supervisors for the
erection and commissioning of the plant, including connection to the
grid.
|
|
Swe-Pol Link
1998
|
The 300 MW HVDC project
between Poland and Sweden. Site supervision on behalf of the investor.
|
|
Undisclosed client
1998
|
Due diligence study for 10 MW
windfarm project in Poland. Activities included production estimate for
the windfarm, investment cost, energy pricing, ownership structure and
assessment of the economy.
|
|
Kobo
1998-1999
|
A feasibility study analysing
construction of a CHP plant (30 MWe, 60 MWt) with fluidised bed boilers
at Bogdanka coal mine, using waste coal from the mine.The study also
analysed the possibility to cover heat demand of neighbouring towns by
the new CHP plant.
|
|
Energoinwest Białystok
1998-1999
|
Feasibility study for
modernisation of Fasty CHP plant in Bialystok, covering usage of sludge
from the municipal sewage treatment plant as fuel for the boilers of
the CHP plant.The feasibility study will cover technical solutions as
well as economic and financial issues related to finding short term as
well as long term solutions for the CHP plant and the municipal sewage
treatment plant. Issues related to combustion of sewage sludge were an
essential part of the study.
|
|
ABB Sweden
1998
|
Construction permit for HVDC
cable project between Poland and Sweden. Authorisation of civil design.
|
|
Starogard Gdański Polpharma
S.A.Vattenfall Poland Sp. z o.o.
1998
|
Co-operation with Vattenfall
in connection with commissioning of new fluidised boilers at industrial
CHP owned by Polpharma pharmaceutical plant.
|
|
ChełmZamojska
Spółka ElektroenergetycznaEastern Generation Ltd.
1998
|
Feasibility study of a CHP
unit for the city of Chełm. Analysed alternatives included a 60 MWe gas
fired combined cycle plant, as well as 60 MWe coal fired CFB and PC
boiler plants. The issue of utilising waste coal from the nearby
Bogdanka coal mine was discussed in detail.
|
|
Opole Power Plant
1997-1998
|
Analysis researching the
possibilities of introducing technical and organisational changes at
Opole Power Plant, to improve and rationalise its operation. The
coalfired power plant consists of 4 equal units with a capacity of
approx. 350 MWe and is one of Poland's most modern power plants.
Technical benchmarking with Danish power plants.Analysis researching
the possibilities of introducing technical and organisational changes
at Opole Power Plant, to improve and rationalise its operation. The
coalfired power plant consists of 4 equal units with a capacity of
approx. 350 MWe and is one of Poland's most modern power plants.
Technical benchmarking with Danish power plants.
|
|
Bełchatów II Power
Plant Management
1997
|
Independent expert opinion for
the study on super critical parameters and optimisation of unit
capacity for Bełchatów II.
|
|
Kostrzyn Paper MillVattenfall
PolandSp. z o.o.
1997
|
Feasibility study covering
rehabilitation of an industrial CHP plant at Kostrzyn Paper Mill.The
study covered analysis of heat and power demand and a technical
assessment of the existing equipment. The alternatives analysed
included combined cycle alternative consisting of gas turbines and
waste heat recovery boilers with supplementary firing, each with a
capacity of 70 ton/h steam.Preparation of full tender documentation for
modernisation of the existing and erection of two new gas fired
boilers. Tendering procedure and selection of Contractor.
|
|
Elektrociepłownia Zielona
Góra S.A.Danish Energy AgencyPartner: DPC.
1995-1998
|
Preliminary feasibility study
for modernisation Zielona Góra CHP Plant. The project was
grant supported by the Danish Energy Agency and co-financed by EC
Zielona Góra.The project included determining the heat,
steam and electricity demand. A number of plant concepts were analysed
such as biomass fired boiler and gas fired combined cycle plants. The
use of domestic low calorific gas was analysed. A combined cycle plant
with a capacity on 100 MWe based on domestic gas was analysed in
details covering technical, economic as well as financial matters
including defining security package covering off-take contracts.
|
|
Zespół Elektrowni
Ostrołęka
1994-1995
|
Feasibility study for
modernisation of Ostrołęka A CHP plant. The following alternatives were
investigated: rehabilitation of existing CHP, district heating
extraction from power plant Ostrołęka B, new coal fired CFB CHP, new
combined cycle gas fired CHP. The coal fired CFB and the gas fired
Combined Cycle plant were selected as the most attractive solutions and
detailed financial analysis were prepared for these alternatives.
|
|
Zespół Elektrowni
Ostrołęka
1995-1995
|
Pre-feasibility study of bark
firing at Ostrołęka A CHP Plant.The following alternatives were
investigated: new multifuel CFB boiler, additional furnace to the
existing boilers, new Bubbling Fluidized Bed (BFB) boiler, retrofit of
the existing PC boiler to BFB bark firing boiler. The latter
alternative was implemented. ELSAMPROJEKT prepared investment package,
and long-term fuel supply contract, implementation study, detailed
tender specification, and contract with main contractor.
|
|
Zespół
Elektrociepłowni Bielsko-Biała SAThe European Bank for Reconstruction
and Development
1995-1995
|
Owner’s Engineer
services for EBRD during the construction of a turn-key project
involving the construction of 55 MW CHP unit. The project was
subsidised by the European Bank for Reconstruction and Development.
|
|
Polskie Sieci
Elektroenergetyczne S.A.Danish Environmental Protection Agency
1993 - 1994
|
Technical Assistance to Polish
Power Grid Company (PSE)Preparation of a study "Potential of priority
and CHP Development in Poland" for the Polskie Sieci
Elektroenergetyczne (Polish Power Grid Company).In 1992 PSE agreed with
the World Bank to initiate a least cost plan for the development and
rehabilitation of the Polish power plants. Part of this study is an
analysis of the potential for development of cogeneration on the basis
of existing and new power plants.
|
|
ABB Power Generation, Baden,
Switzerland
1995-1995
|
Technical Assistance in
connection with TEP1 at Turów Power Station.In cooperation
with Ahlstrom PyroPower (USA) ABB Power Generation was awarded the
contract to rehabilitate up to six units of the Polish lignite-fired
2000 MW power station in Turów. The rehabilitated units were
supplied with new turbines/generators and new CFB boilers. The capacity
of each unit is 230 MWe.Prior to the rehabilitation, a Technical
Evaluation Package (TEP1) was carried out in order to determine how
much of the existing installation could be reused under the new
conditions.
|