Certificate 9444 QMS 2011O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoHeat accumulatorsBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



References


Shown below is our full reference list.

Client/Year Project description
PGE Górnictwo i Energetyka Konwencjonalna
S.A.
2011 - in progress
Technical consultancy in the process of selecting a contractor for the construction of biomass co-firing installation bypassing coal mills at Unit 8 of Dolna Odra Power Plant. The min. 40MWt installation will be fired with pellets, briquettes and straw bales at the total amount of 54000 t/y.
The scope of works includes evaluation of preliminary offers, participation in negotiations with potential contractors, preparation of the final version of Tender Specification and final bid evaluation.
Tendering procedure based on Public Procurement Law – negotiated procedure with publication.

PGNIG S.A.
2011
Due diligence services covering technical and environmental issues in the process of purchasing Vattenfall Heat Poland S.A. Tasks included evaluation of the condition of generation facilities at CHP plants and HOB plants in Warsaw and Pruszków. Maintenance programmes and investment plans of the company were evaluated. Analysis of heat market and of potential new competition in the heat market was conducted. An investment and development programme was prepared, including required maintenance, modernisation and investments as well as current and planned environmental requirements. A technical and economic model was prepared to be used by the leading advisor in the company evaluation. Basing on technical and economic analyses conducted and taking into account formal issues, investment and development programmes for VHP were prepared, including the possibility of constructing new generation sources.

PGNIG S.A.
2011
Due diligence services covering technical and environmental issues in the process of privatising SPEC - Stołeczne Przedsiębiorstwo Energetyki Cieplnej (Warsaw Heat Company). Tasks included evaluation of technical condition of the district heating system and the existing heat generation facilities in Warsaw area. Demand for maintenance, modernisation and investment was determined taking into account present and planned environmental requirements. A technical and economic model was prepared to be used by the leading advisor in the company evaluation. Basing on technical and economic analyses conducted and taking into account formal issues, investment and development programmes for SPEC were prepared, including the possibility of constructing new generation sources.
Potential for new connection to DH system from the Warsaw area was evaluated, with a complexity enabling selection of the best prospective areas for development. For the area of best perspectives, including satellite towns located along the line Ursus-Pruszków-Grodzisk Mazowiecki, a concept of DH system development was prepared, covering a heat demand analysis and heat market development prognosis until 2025. Complexity of the concept makes it possible to select the generation unit (central source and local sources) and the transmission lines. The concept also covered comparison of heat costs for a central heat source versus local small heat sources as well as legal and formal issues.

Dalkia Polska S.A.
2011
Technical analyses in due diligence process as part of SPEC privatisation. Analysis of heat market and of the possibilities to construct new gas or biomass fired heat sources was conducted. The power situation of Warsaw area was also analysed.

Synthos Dwory
Sp. z o.o. Oświęcim
2011 - in progress
Modernisation programme for Synthos Dwory CHP plant.
The work included preparing a concept for plant reconstruction in the form of several alternative investment programmes based on modernisation projects and construction of new coal or gas fired plants as well as reserve and peak load sources fired with various fuels (coal, natural gas, landfill gas, light fuel oil), several process heat demand scenarios (CHP capacity from 250 to 700MWt) and unit operation regime (full cogenetaion, partial condensing mode). Selection of the optimum investment programme was made basing on the most profitable process system, the fuel used and the reliability of heat supply to Synthos Dwory.

Dalkia Poznan
2011
Feasibility study for the construction of new CHP (ECIII) in Poznan.
The objective was to analyse the possibilities of new gas fired CHP plant construction, including a peak load heat source of approx. 65-80MWt, at the area of former Kopanina Heat Plant in Poznan. The analysed alternatives included construction of gas fired engines, gas turbines of approx. 6MWe and a 45MWe CCGT plant. The scope of work covered technical and economic analyses. As a result, technical concept of the new unit was presented as well as operation mode and economic viability of the project.

Vattenfall Heat Poland
2011 – in progress
Environmental impact report for a project of extending Zeran CHP by constructing a 450MW CCGT plant with all necessary infrastructure and elements of spatial arrangement, including 5-month full nature inventory and thermal analysis of the discharge of post-cooling water to the Vistula and Zeran Canal.

Dalkia Łódź S.A.
2011
Pre-feasibility study of CCGT construction at EC-2 Łódź CHP Plant.
The objective of the study was to analyse the possibility of constructing a CCGT unit at EC2 using the existing steam turbines. As a result of CCGT unit construction, coal combustion will be completely eliminated from the process. The scope of work covered technical and economic analyses. As a result, a technical concept of the unit was presented, with the operation mode and the economic viability of the project. After construction of CCGT unit, the CHP Plant is expected to have and output of approx. 200MWt and approx. 100 MWe.

Elektrociepłownia
EC Nowa Sp. z o.o. (Tauron)
2011
Modernisation concept for EC Nowa pumping systems.
The objective was to prepare an optimum concept for the modernisation of the pumping systems at industrial EC Nowa CHP Plant (120MWe, 1580 t/h steam), including piping, metering systems, control and instrumentation and power supply, in order to reduce power consumed by the pumping systems. The study presents the results of energy audit of the pumping facilities and a multi-variant concept of modernisation, indicating optimum solutions. The analysis covered feed water pumps, cooling water pumps, district heating water pumps and process water pumps. As a result of the study, an economically feasible modernisation concept was proposed, resulting in the total reduction of power consumption by approx. 32 GWh/a.

EDF Polska / Cergia
2010-2011
Advisory services to prepare the project of 120MWe/150MWt biomass/coal fired cogeneration unit construction in Torun for implementation.
As part of works, site analysis for the new unit was made, including the possibility of connecting to the existing technical networks and the limitations arising from environmental protection as well as formal conditions for the project implementation. Feasibility study of the unit with fluidised bed boiler fired with coal and biomass, taking into account operation of the existing generation facilities, was prepared. The feasibility study included detailed unit concept with auxiliary systems. Economic analysis including sensitivity analysis of the project was made.
The scope of work included preparing environmental impact report, application for environmental decision, application for the integrated permit, preparation of application to participate in CO2 emission trade system (ETS) and obtaining the permit, and preparing an application to connect the plant to the power grid.
Work also included preparing the concept for the tendering procedure to select the contractor(s) in two formulas: as turn-key contract (EPC) and in package-based formula.

EDF Polska / Kogeneracja
2010-2011
Advisory services to prepare the project of 120MWe/150MWt biomass/coal fired cogeneration unit construction in Siechnice for implementation.
As part of works, site analysis for the new unit was made, including the possibility of connecting to the existing technical networks and the limitations arising from environmental protection as well as formal conditions for the project implementation. Feasibility study of the unit with fluidised bed boiler fired with coal and biomass, taking into account operation of the existing generation facilities, was prepared. The feasibility study included detailed unit concept with auxiliary systems. Economic analysis including sensitivity analysis of the project was made.
The scope of work included preparing environmental impact report, application for environmental decision, application for the integrated permit, preparation of application to participate in CO2 emission trade system (ETS) and obtaining the permit, and preparing an application to connect the plant to the power grid.

Dalkia Łódź
2010
Feasibility study of the construction of heat accumulator tanks at Dalkia Łódź EC-3 (200MWe/830MWt CHP) and EC-4 (210MWe/860MWt CHP).
Technical possibilities were analysed of applying heat accumulators at the existing DH connection systems of EC-3 and EC-4, and the cooperation of heat sources in Łodz DH system including heat accumulation facilities (heat allocation). Optimum capacity of the heat accumulators was determined in the range of 10 000 m3 to 30 000 m3.
A technical and economic model of Łódź DH system was prepared, taking into account relation between the operation of EC-3, EC-4 and the heat accumulator. Economic analysis was made for various alternatives of heat accumulators’ operation and the cooperation of both CHP plants in ŁOdz DH system.

Vattenfall Heat Poland
2010-2011,
2011- in progress
Siekierki CHP boiler OP230 K-1 conversion to biomass fired BFB boiler. The project includes conversion of the boiler and implementation of biomass handling systems with the systems enabling deliveries of approx.. 320,000 t/a biomass by rail and by road.
A feasibility study was prepared to determine the project concept. The study analysed two solutions for boiler operation: common steam header with other boilers or as a separate unit (boiler + turbine set).
Concept of flue gas condensing system and biomass handling (320,000 t/a pellets) was described. Economic analysis of the project was made as a basis for optimising project alternatives.
The scope of work also included preparation of environmental impact report and an application for environmental permit and preparing an application for land development conditions, including permitting procedures and obtaining the said permits for the project.
The work also included preparation of tender documents (tender specification, contract) for two tenders: to select unit modernisation contractor and biomass handling system contractors, as well as participation in the evaluation and selection of contractors.

EC Rzeszów S.A.
2010- in progress
Engineering consultancy services related to gas turbine failure at Rzeszów CCGT Plant.
Work included evaluation of the required scope of GT repair after failure and evaluation of the quality of repair for 100 MWe Rzeszów CCGT Plant.

Vattenfall Heat Poland
2010
Feasibility Study: Analysis of a project involving construction of a gas fired unit at Żeran CHP Plant, Warszawa, including optimisation of technical and operational parameters.
The study included analysis of multiple project alternatives for the construction of CCGT unit of approx. 300-500 MWe and approx.. 250 MWt. Optimisation analyses were conducted, taking into account several sizes of gas turbines and CCGT units, in one-shaft and multi-shaft configurations, with backpressure stream turbine and with extraction/condensing steam turbine.
Thermal balances and a thermodynamic model using Thermoflex software were prepared.
An economic analysis of project profitability was carried out. Various operation modes were analysed depending on the change of power prices throughout the day and on the gas price structure. The analysis included operation of VHP’s other generating facilities.

ENERGA Elektrownie Ostrołęka S.A.
2009 - in progress
Preparing the project of Ostrołęka C Power Plant construction (first unit approx. 1000 MWe). The scope of work included the Concept Study including detailed feasibility study of the project and environmental documentation, as well as materials for the tender to select the Contractor for Ostrołęka C Power Plant construction.
As part of feasibility study, construction of new power plant with 1000MW unit (PF boiler fired with coal with up to 20% of biomass co-firing possibility) with a cooling tower. A financial and economic analysis of the project was made, as well as sensitivity analysis, risk analysis and business plan for the project.
The work also included support for the Client in the procedures related to the environmental decision for the project.
The scope of work covers also preparation of full Tender Specification (including draft Contract) for tendering procedure based on Public Procurement Law (negotiated procedure with publication), participation in negotiations and assistance for the Client during entire tendering process.

PGE Elektrownia Opole S.A.
2009-2011
Technical consultancy in the tendering procedure to select the Contractor for biomass handling system and biomass feeding installation in compliance with Public Procurement Law, including also preparing Tender Specification, tender evaluation and participation in negotiations.
As a result of tendering procedure, the Contract was awarded.

PGE Elektrociepłownia Gorzów S.A.
2009-2010
Technical study of biomass installation at Gorzów CHP Plant.
The study of OP-140 boiler conversion to biomass firing and construction of fuel handling system at Gorzów CHP Plant to produce renewable power.
The study includes different alternatives of biomass unit. Alternatives with wet and dry biomass were analysed. Conversion of existing PF OP-140 boiler from coal to biomass was analysed and new boiler was taking in to consideration as an alternative. Thermal calculations for the complete unit were carried out (boiler and turbine).

DONG Energy A/S
2009-2010
Owner’s Engineer services during the construction of Karcino Wind Farm (51 MW).
The scope of work included preparing tender specification for EPC Contract based on FIDIC for electrical and civil engineering part, participation in negotiations with contractors and Owner’s Engineer service for electrical and civil engineering part.

Dalkia Poznan
2009
WTE plant in Poznan – study of site conditions for WTE plant in Poznan, for the total 250,000. t/a municipal waste and sludge from water treatment plant.
The study included site preparation, alternatives for the connection of external supply systems to the infrastructure of EC Karolin or to external infrastructure as well as a review of environmental issues.

GPEC Sp. z o.o. (Stadtwerke Leipzig Group)
2009
Services of technical advisor in the project preparation phase for the construction of a new cogeneration plant fired with straw, to supply Gdańsk DH system.
The services included preparing a Feasibility Study, review of available aid financing sources and their mechanisms as well as analysis of straw acquisition possibilities and straw contracting for the project (including guidelines for logistics and sample contract).
Feasibility Study presented formal, technical and organisational conditions for the project. Three power plant sizes were analysed – approx. 26 MWe, 20 MWe, 15 Mwe, with respective biomass consumption of: 155,000 ton straw and pellets, 120,000 straw, 93,000 straw. Various plant configurations were analysed, such as using a reserve boiler house, applying flue gas condensation, using pellets or wood chipls as supplementary fuel, as well as various options of operation depending on the market conditions and the risk of biomass unavailability.
An economic and financial analysis was prepared, assuming two different financing options, with a sensitivity analysis.
An application for environmental decisions for the project was prepared, including project description and other required attachments.

El. Rybnik S.A.(EDF Polska)
2009
Review of technologies for biomass use in energy prodution and analysis of application at Rybnik Power Plant in order to increase biomass utilisation (Feasibility Study).
The objective of the study was to determine best technical solutions enabling the increase of biomass utilisation up to 700 000 Mg/a.
Multi-alternative concept analyses were made, taking into account co-firing various biomass types with coal in the existing unit boilers, as well as concepts of constructing a dedicated biomass firing installation (new boilers, biomass gasifier). Analyses covered biomass at different processing level, such as wet biomass, dry biomass, torrefied biomass, liquid biomass, straw in bales.
The study analysed issues related to biomass storage and logistics, including the existing transport limitations. Analysis of formal conditions for power to be qualified as renewable was made, as well as the analysis of metering and billing issues.

ZEW Kogeneracja S.A.(EDF Polska)
2009
Analysis of location conditions for construction of a supercritical condensing/CHP unit of approx. 450 at Czechnica CHP Plant.
The scope of work included analysis of location conditions for construction of a new condensing/CHP unit of approx. 450 at Czechnica CHP Plant. A supercritical unit with pulverised coal boiler was analysed, with wet FGD and catalytic DeNox system suitable for CO2 capture in the future. To determine the conditions of CHP construction and operation, a preliminary technical concept of the plant was prepared located at the land plot assigned.
The work included among other things analysis of the site and the conditions arising from current spatial arrangement and use of the land, environmental impact of the project, power grid connection, DH connection and conditions for CO2 storage.

PGE EC Rzeszów S.A.
2009-2010
Commercial, legal and technical consultancy related to the selection of Contractor for the construction of cogeneration unit based on vegetable oil fired Diesel engines (electrical capacity of engines system – 25-30 MW).
The scope of work covered the complete tender documentation for tender with negotiations (including Functional Programme and EPC Contract), participation in the entire process of contractor selection and advice in formulating optimum business solutions until signing the contract.
The tendering procedure was conducted.

Dalkia Poznan ZEC S.A.
2009
Technical and economic guidelines for PF OP-140(1K1) boiler conversion to biomass fired BFB boiler at Karolin CHP.
The study analysed the project involving modernisation of the unit with the conversion of PF coal fired boiler into biomass fired fluidises bed BFB boiler and construction of biomass handling system at Karolin CHP Plant, as well as turbine modernisation from backpressure to extraction-condensing. The analyses included a new chimney stack dedicated for the modernised boiler and analysed comparative solutions for FGD and SNCR plants. Main fuel after conversion is to be wood chips and non-forest granulate in the amount of approx. 230,000 t/a. A biomass handling system for the assumed types of biomass was proposed as well as a concept of unloading station, storage, crushing and transport to the boiler for the miscanthus straw.
The study included project profitability study.

PKN Orlen S.A.
2009
Preparing implementation of the project „Construction of 2x420-460MW near Anwil S.A. area in Włocławek”.
The works included preparing Feasibility Study analysing multiple alternatives for a two-phase construction of two CCGT units. Construction alternatives were presented. A closed cycle cooling system with cooling towers was analysed as well as an open cooling system using the Vistula river water. Technical and legal conditions for power plant construction were prepared. A preliminary concept for power export and gas fuel supply was presented, determining also the conditions of the local gas network operator. Economic analysis of the alternatives was made, basing on long term prices forecasts.
Guidelines for the Environmental Impact Assessment were prepared. General Investment Costs Schedule was prepared, together with the project budget. Project profitability analysis was also implemented.
Technical Appendix to Tender Specification for Turn-Key Delivery of CCGT Unit was prepared.

Dalkia Łódź S.A.
2009
Technical and economic guidelines for converting OP230 boiler to a biomass fired fluidised bed boiler at EC-4 CHP Plant in Łódź (biomass consumption 370,000 t/a.).
A detailed concept of boiler conversion was prepared with BFB furnace, technology of biomass combustion was presented together with installation parameters. Influence of modernised unit on the other Dalkia Łódź’s plants was analysed. Biomass transport and logistics assumptions as well as biomass handling system were prepared.
Analysis of economic viability of the project was carried out.

International Paper Kwidzyn
2009
Preliminary feasibility study for conversion of coal fired OP-140 boiler to fluidised bed biomass boiler.
As part of the study, the scope of boiler retrofit required for biomass firing was determined and biomass handling system was described along with the necessary adaptations to the existing infrastructure. Planned biomass consumption – approx. 240,000 t/a chips.
Analysis of economic effectiveness of the project was conducted.

Vattenfall Heat Poland
2008-2011
Participation in tendering procedure to select EPC Contractor for Siekierki CHP unit implementation.
The subject of tender is an extraction/condensing CHP unit with an open cooling system, with a gross electrical capacity of approx. 480 MW. The unit is to operate with the following steam parameters: live steam not lower than 600°C and reheat steam not lower than 600°C. The unit will have a pulverized fuel boiler fired with hard coal (with biomass pellets co-firing possibility) with a complex flue gas cleaning system. The unit will also produce heat for Warsaw district heating system.
As part of the work, the unit concept was optimised and Tender Specification for the unit was prepared, covering technical, commercial and legal aspects for EPC project implementation.
Tendering procedure based on Public Procurement Law was conducted as negotiated procedure with publication. The scope of work included cooperation with tender evaluation and participation in negotiations.
As a result of tendering procedure, final bids were submitted and evaluated.

Dalkia Łódź S.A.
2008-2009
Feasibility study to determine optimum option to reconstruct generation capacity of EC2 (87MWe/578MWt). The study analysed using fluidised bed and pulverised fuel technology, basing on biomass, hard coal or gas. A technical concept of the proposed solution was prepared. As part of the study, analysis technical condition documentation regarding main buildings, equipment and systems of EC2 was made. A technical and economic model was prepared for the operation all three CHP plants of Dalkia Łódź as a part of Łódź district heating system. Alternative concepts of investments after shutdown of old generation equipment.
For the discussed investment alternatives economic effectiveness analysis was made.

DONG Energy A/S
2007-2010
Owner’s Engineer services during the construction of Karnice Wind Farm (30 MW).
The scope of work included preparing two tender specifications for EPC Contracts based on FIDIC for electrical and civil engineering part, participation in negotiations with contractors and Owner’s Engineer service for electrical and civil engineering part.

Vattenfall Heat Poland
2007-2009
Feasibility study of biomass fired CHP Plant in Pruszków. Technical and economic analysis of multiple alternatives were made for the expected heat demand of approx. 250MWt. Plant sizes from 30MWe to 70Mwe, configured as one unit with one boiler, one unit with two boilers or two units were analysed. The option to applu a 3000 m3 to 20 000 m3. heat accumulator tank was also analysed.
The study also included analysis of the biomass market and possibilities to establish energy crop plantations.

Vattenfall Heat Poland
2008
Preparing applications for environmental conditions as part of power units construction permit procedure, for the following plants:
480 MWe coal fired unit, two CCGT units 400MW each, 250 MW CCGT and 68 MW coal-and-biomass fired CHP plant
with all the necessary documentation.

Vattenfall Heat Poland
2008
Preparing applications for issuing development conditions for the following power units:
480 MWe coal fired unit, two CCGT units 400MW each, 250 MW CCGT and 68 MW coal-and-biomass fired CHP plant
with all the necessary documentation. Applications were based on technical concepts prepared basing on studies analysing multiple alternatives.

Dalkia Łódź S.A.
2008
Technical and economic guidelines for biomass firing in steam boilers of EC-3 CHP Plant in Łódź (biomass consumption 85,000-300,000 t/a.).
A complex concept of EC-3 retrofit for biomass firing, including boiler modernisation and biomass handling. Technical alternatives of modernisation were analysed, including biomass co-firing with coal in OP-230 steam boilers, as well as conversion of OP-130 or OP-230 boiler to biomass firing (coal fired PF boilers conversion to fluidised bed boiler 100% biomass fired). The main biomass fuels analysed were pellets of agricultural or non-agricultural origin, as well as wood chips.
For the discussed technical alternatives analysis of economic viability of the project was made.

Vattenfall Heat Poland
2008, 2010
Preparing the concept of post combustion technology for a 450 MW–550 MW power unit.
Balance calculations were made for several ways of connecting CCS with the power unit and the existing system. The report included a preliminary CCS concept and proposed solutions for power supply, mechanical energy supply for main equipment drives and heat for the unit CCS system as well as waste heat recovery from CCS for district heating.
In 2010, update of the study was prepared, using up to date knowledge of CCS technology.

Vattenfall Heat Poland
2008
Preliminary feasibility study for a municipal waste incineration plant of 300,000 t capacity.
The concept included using the energy from waste and the plant operating as a CHP plant. The concept covered preparing the plant layout, waste reception system, boiler house with a flue gas cleaning and furnace waste handling. A cogeneration plant was analysed with different turbine solutions (CHP turbine, condensing turbine with heat extraction) and the resulting different values of power and hear production.
A comparative economic analysis of the considered solutions was made.

Vattenfall Heat Poland
2008
Long term development plan for Vattenfall Heat Poland CHP group in Warsaw and Pruszków.
Analysis of development directions for energy sources in Warsaw, taking into account the existing internal conditions and the changing external factors (legal, market-related, environmental etc). The report took into consideration the market situation in the city and in the country as well as performance data of the existing and new (planned) generation units, fuel characteristics, emissions and waste production, material wear etc. Modernisation of the existing facilities and generation units was analysed as well as the construction of new plants such as coal units, IGCC, Oxy-Fuel and gas units CCGT.
A comparative analysis of profitability was made for the selected alternatives, basing on the prepared technical and economic operation model for all the VHP plants operating as part of Warsaw district heating system. Benefits and risks were indicated for each alternative.
Profitability analysis was conducted, aiming in comparison profits and risks of all development alternatives.

EC Białystok S.A. (E.On Group)
2008
Concept of a heat recovery system from flues gas condensation for a 75 MW boiler fired with biomass (fuel humidity approx. 40%). The study presented multiple alternatives for the 13-15 MW system consisting of a scrubber and a condenser recovering head for district heating. Technical solutions were presented as well as location and connection of the heat recovery system with flue gas ducts, DH system and raw water system. Technical and economic analyses were made, as well as project profitability analyses, taking into account environmental issues and grants.

Vattenfall Heat Poland
2008
Feasibility study of a biomass unit for Siekierki CHP Plant. Analyses of multiple technical alternatives for biomass in the form of wood chips and pellets, gasifier, coal fired boiler conversion to biomass, construction of a new biomass boiler, construction of a new biomass unit, biomass handling systems for 50-300 thousand t/a biomass.

Poland’s Ministry of Science and Higher Education
2008
Commissioned research project PBZ-MeiN-4/2/2006, research task no. I.2.6/1 „Supercritical coal units – use in cogeneration”
Elsamprojekt Polska participated in the project as a member of a consortium consisting of Poland’s leading R&D institutions and technical universities.
In the study, a detailed analysis was made of thermodynamic model for 400-800 MW ultra supercritical coal fired units with and without CO2 capture by amine method. Optimisation analysis were carried out, taking into account technical possibilities and economic effectiveness of heat extraction from the unit and of heat recovery from CCS system for district heating purposes.

J-Power, Zajaczkowo Wind Farm
2007
Preparation of Wind Farm Operation and Maintenance Manual, including the requirements for wind farm operator and power grid operator regarding the division of equipment in terms of operation and maintenance, operation of 110/30 kV substation and wind turbine, operation actions, safety principles, co-ordination of operation and maintenance.

BOT Opole S.A.
2007
Analysis of multiple alternatives of using the auxiliary boiler for renewable power production, including the modernisation of existing grate boilers, a new straw fired boiled, a new wood chips fired boiler, a biomass gasifier cooperating with the unit boiler, concept of including the biomass boiler in the HP regeneration system of 370 MW unit; concepts of biomass handling systems for wood chips, straw, pellets.

ZEW Kogeneracja S.A. (EDF Polska)
2007-2008
Consulting services in the preparation and implementation phase of the project involving biomass co-firing system for Wroclaw CHP Plant unit 1, including analyses to select the best technical and economic alternative.
The selected alternative included co-firing dry biomass (pellets) with approx. 45% energy input, in a pulverised fuel boiler OP230 and a biomass handling system with silos and biomass transport to the boiler. An environmental impact report was prepared for the project, as well as an application for project development conditions. Technical specification was prepared for tendering procedure for the modernisation of boiler OP230 and construction of biomass handling system.
The documentation prepared made it possible to select contractors and conclude contracts for the project implementation.

Vattenfall Heat Poland
2007-2008
Analyses regarding the possibility of constructing a new CHP Plant in Grudziądz municipality (kujawsko-pomorskie province).
The report presents the concept of a coal fired 2x800 MW ultra supercritical power plant with an open cooling system (water from the Vistula), and alternatively with a closed cooling system with a cooling tower. A preliminary layout of the plant in the area indicated by the Employer was made. External conditions for the project in the suggested location were analysed, including connection to the HV power grid, connection to the road and railway systems, possibilities to take in and discharge post-cooling water, collisions with airway routes. A preliminary analysis of railway and truck transport for the new power plant was made, including agreements with the Polish Railway regarding the construction of a railway siding. A preliminary geotechnical analysis of the location was carried out to determine the conditions for building settlement. A preliminary environmental impact assessment was made for the new power plant, including Nature 2000 and other protected areas. Taking into account the analyses specified above, a general investment budget was prepared for the green-field project with all the accompanying infrastructure in the analysed location

Vattenfall Heat Poland
2007
Environmental impact assessment report regarding wet desulphurisation plant for Siekierki CHP Plant, preparing application for environmental decision, submission of application to the relevant environmental authorities and negotiations with the authorities. The project obtained environmental decision for constructing the plant.

EC Białystok S.A. (E.On Group)
2007-2008
Owners Engineer. The project involves construction of biomass plant for renewable power generation. It included PF coal fired boiler conversion into a bubbling fluidised bed (BFB) boiler firing biomass similar to wood chips, and construction of complete biomass handling system. Boiler capacity after modernisation 105t/h steam; annual biomass consumption up to 200,000 t.

EC Białystok S.A.(E.On Group
2007
Technical and economic concept for DH supply, including construction of DH part and heat accumulator tank.
The objective of the study was to analyse several technical alternatives for modernization of internal DH part at EC Białystok. Analyses of the pumping system and DH water piping were made. The influence of heat accumulator tank on levelling daily heat demand amplitude was analysed, as well as the reduction of costs of participation in balancing market and the impact of introducing varied power prices at different times of day.
Heat accumulator capacities analysed were from 5000 m3 to 20000 m3 , with the indication of 12000m3 as the best choice.
Rebuilding of the pumping station is realised in 2008. Heat accumulator is under construction.

Gdańskie Przedsiębiorstwo Energetyki Cieplnej (Stadtwerke Leipzig)
2007
Feasibility study of a cogeneration unit with municipal waste and biomass as main fuel. A number of technical and economic alternatives were analysed for a forecast heat demand of approx. 100MWt. Main alternatives included: Waste-To-Energy project based on unsorted municipal wasted and alternatively energy fraction separated from waste and a biomass installation, as well as heat accumulator with capacity of approx. 8000 m3. Biomass types analysed included straw, pellets and wood chips.

ZEW Kogeneracja S.A. (EDF Polska)
2007
Study of biomass generation unit at ZEW Kogeneracja S.A.”, aiming to find an optimum technical and economic alternative for using biomass fuel for renewable energy production at Wrocław and Czechnica CHP Plants.
In the study functionality of heat accumulator with capacity of 2000-3000 m3 was examined mainly for levelling of irregularity of heat consumption by green house.

Margonin 120 MW Wind Farm
2006
Analysis of renewable energy market in Poland, including evaluation of the present situation and development forecasts (including price projections) for renewable sources.

Vattenfall Heat Poland
2006
Environmental impact report for a project involving construction of a new 480 MWe unit at Siekierki CHP Plant in Warsaw, prepared in order to obtain environmental permit for the project. The report includes the environmental impact of the entire Siekierki CHP Plant after implementing the new unit and the planned environmental systems (flue gas desulphurisation and deNOx plants).

Zakłady Chemiczne Police S.A.
2006

Concept of fuel conversion from fuel oil to natural gas for selected systems of Police Chemical Plant.
The work included technical and economic analyses of multiple alternatives for fuel conversion from the currently used mazout and light fuel oil to natural gas. Basing on the economic analysis, which included investments costs, differences in the fuel costs and in the related costs (such as operation costs, environmental costs, maintenance costs), recommended alternatives were presented.

Vattenfall Heat Poland
2006
FGD plant for Siekierki CHP Plant in Warsaw.
The scope of work included preparing a concept for FGD and a new chimney stack for Siekierki CHP, for the existing coal-fired units and the planned new unit, including analysis of several alternatives. The study compared the FGD concepts based on wet lime technology, semi-dry method and dry method. As a continuation of the conceptual work on multiple alternatives, a detailed FGD concept for coal fired boilers at Siekierki CHP was prepared.
Works included preparing the application and appendices for the application for issuing construction conditions for the selected alternative. Tender Specification was also made for FGD system with two absorbers for 8 boilers, for 3.1 million Nm3/h, including functional programme and the technical part of the contract with appendices necessary for public procurement procedure.
FGD system at Siekierki is currently under construction.

Vattenfall Heat Poland
2006
Analysis of possibilities of constructing new units in Poland; the study analysed location conditions for construction of new coal fired and CCGT units, analysis of the existing energy sources and local heat markets, selection of optimal locations for new power plant of 500-2000 MW. Sites at the existing power plants were analysed as well as green field locations.

Vattenfall Heat Poland
2006
Pre-feasibility study for a construction of a new unit in Warsaw.
The analyses covered multiple alternatives of power units from 200 to 700 MWe, sub- and supercritical, of varied heal output. Analyses were made for two possible locations, at Siekierki CHP Plant and at Kawęczyn Heat Plant. Technical and economic optimisation involved incorporation of new facilities into the existing process systems, in compliance with the present and future environmental requirements. The analyses took into account a number of parameters and conditions influencing the optimal selection of recommended alternative, such as combustion technologies, steam parameters, thermal cycle of the plant, concept of district heating part, various cooling solutions involving an open cooling system as well as dry and wet fan cooling towers, plant preparation for the future requirements for CO2 reduction. Thermal cycles of the analysed alternatives were modelled and analysed for a number of loads. As a result of the analyses, supercritical coal-fired units were recommended as optimum solution, for the location of Siekierki - 450 MWe net, for the location of Kawęczyn – 650 MWe.

EC Białystok S.A.(E.On Group)
2006
Preparing tender specification for conversion of OP-140 boiler to a biomass fired fluidised bed (BFB) boiler and implementation of biomass handling system at Białystok CHP Plant.

EC Białystok S.A(E.On Group)
2006
Preliminary biomass contracting for Białystok CHP Plant. (approx. demand 200,000 t/a). Preparing letters of intent and a draft of long term biomass purchase agreement to secure interests of both parties, covering technical issues, quality assurance, price development and billing system, organisation and logistics etc. Letters of intent signed as a result of negotiations covered the supply of biomass of various origin in compliance with relevant Polish legislation.

J-Power
2006-2008

Zajączkowo Wind Farm project. Services included preparing tender specification for a wind farm in north-western Poland, consisting of 24 x 2MW. In the implementation phase Elsamprojekt performed the function of Owner’s Engineer.

Elsam A/S
2006-2007
Ostrowo Wind Farm project. Services include preparing tender specification for a wind farm in north-western Poland, consisting of 17 x 1.8 MW wind turbines, based on FIDIC and participation in negotiations with contractors. In the implementation phase Elsamprojekt performed the function of Project Manager and was responsible for Owners Engineer services (electrical systems and civil works) and Project Management.

J-Power
2006
Due diligence and review of documentation for a wind farm to be constructed in northern Poland (Zajączkowo, 24x2MW),, carried out for the Investor in order to provide a basis for the final decision on project implementation.

Karpacka Spółka Gazownictwa S.A. / Pekao Access
2006
Technical due diligence of Łańcut heat plant as part of privatisation process.
The heat plant has 30 MWt thermal capacity in coal fired grate water boilers and approx. 10 km of DH network.
Technical condition of heat plant equipment was evaluated – as well as the need for modernisation. Operation of the CHP plant was evaluated and the heat sale was analysed. Alternative modernisation programmes were prepared. Technical risk was evaluated.

Vattenfall Heat Poland
2005
Feasibility study of installing heat accumulator tank at Żerań CHP Plant, Warsaw
The study investigated the possibilities of incorporating a heat accumulator in the existing DH system at Żerań CHP Plant. Selection of optimal heat accumulator capacity was done in range of 10 000-40 000 m3. Economic analysis was made for a number of operation modes.

Vattenfall Heat Poland
2005
Technical and economic analysis of installing a steam engine at CHP Pruszków. A number of engine designs were analysed and economic analyses were made for the selected alternatives.

Zakłady Chemiczne Police S.A.
2005
Pre-project study evaluating economic viability of the projects involving modernisation of turbine-driven compressors of synthesis gas and CO2 turbine in the ammonia and urea production plant.

Elana Energetyka
2005

Technical and economic audit at industrial CHP Plant Elana Energetyka to formulate reorganisation guidelines. The audit included two CHP plants fired with coal and heavy fuel oil (6 steam boiler with 4,5 MWe turbine and 3 steam boilers with 20 MWe turbine), compressed air, cool, nitrogen systems as well as water supply and sewage system.
As part of the work, potential of the existing equipment was assessed and rationality of the investments conducted and planned so far. Possible development concepts and directions were prepared for modernisation projects.

Radpec S.A.
2005

Full feasibility study of waste incineration plant construction in Radom, according to The National Fund for Environmental Protection and Water Management (NFOŚiGW) requirements. Analysis of waste fuel availability, including RDF and sludge; preliminary analysis of technical alternatives of the waste-to-energy plant, producing heat and power in cogeneration, including incorporation of heat accumulator with capacity of approx. 2000 m3.
Economic and financial analysis of the selected alternatives was conducted.

EC Białystok S.A.(E.On Group)
2005-2009
Modernisation and automation project for Białystok CHP Plant. Elsamprojekt was a Project Manager for the entire project. Automation was carried out at three CHP units of EC Białystok and included auxiliary systems, and DH water pumping stations were also replaced. The scope of work included preparing Tender Specification and tender evaluation, and advisory services during the implementation of automation werks, as well as coordination of construction and overhaul works.
As part of the project, basing on documentation prepared by the Client, automation of DCS system for the following plants was carried out:
-   units BC - 50 no. 1, 2, 3
- auxiliary systems including coal handling, slag handling, ash handling, start-up oil system, connection to the power grid, water conditioning plant
ELSAMPROJEKT Polska managed the preparation of modernisation and automation programme, and supervised design and erection works performed by external contractors.

Vattenfall Heat Poland
2005
Feasibility study of installing heat accumulator tank at Siekierki CHP Plant, Warsaw
The study investigated the possibilities of incorporating a heat accumulator in the existing DH system at Siekierki CHP Plant. Analysed heat accumulator capacity was 15 000-40 000 m3. Economic analysis was made for a number of operation modes. Tender specification for heat accumulator technical design was prepared.
Project was realised and heat accumulator is operating since the 2nd quarter of 2009.

BOT Elektrownia Bełchatów S.A
2005-2006
Study on location of flue gas desulphurisation plant for units 1 and 2, aimed to select a location optimal form both economic and technical point of view.


EC Białystok S.A.(E.On Group)
2005-2006
Feasibility study of boiler coal-to-biomass conversion at Białystok CHP Plant. The study consisted of analysis of the possibilities of supplying timber biomass to Białystok CHP Plant; technical-economic analysis of possibilities of conversion; financial analysis of the investment; environmental impact report to obtain environmental permits.

Vattenfall Heat Poland
2005
Environmental due diligence of Kozienice Power Plant (coal fired units 8x200MW, 2x500MW), including necessary environmental investment projects.
Risk related to adopted and planned environmental regulations were identified and evaluated. Condition of the plant in terms of compliance with current and future requirements of environmental protection. Planned investments were assessed and the necessary investments were indicated in the context of environmental protection.

PCC AG
2005
Technical and market due diligence of Kozienice Power Plant. (coal fired units 8x200MW, 2x500MW) as part of privatisation process.
Technical evaluation of Power Plant equipment was made and technical risks were identified. Risks related to legislation including environmental legislation was assessed. The power plant investment programme was assessed as well as the position of the plant on the Polish market. Technical and economic model of the plant was made and a proposal for the plant development was drafted, including calculation of the power plant value based on long term cash flow projection.

Vattenfall Heat Poland
2005
Environmental due diligence of Bydgoszcz CHP Plant. The power plant group consists of three CHP plants of respective capacities 187 MW/270MWt, 810MWt and 80MWt.
Risks related to current and planned environmental protection requirements were identified and evaluated. The condition of installation was assessed in terms of compliance with the current and future environmental standards. Planned investments were assessed and necessary environmental assessments were identified.

PCC AG
2005
Technical and market due diligence for Ostroleka Power Plant Group (ZEO).
The power plant group consists of a CHP Plant (75MWe/367MWt) and a power plant (647MW). Technical condition of the power plant and CHP plant equipment were assessed and technical risks were identified. Risks related to legislation were assessed, including environmental legislation. ZEO investment progress was evaluated. ZEO position in the Polish market was estimated. A technical and economic model of ZEO was prepared. A proposal of development was prepared together with a calculation of ZEO value basing on long term cash flow projections.

Atex Sp. z o.o.
2005
Preliminary feasibility study of a biomass-fired CHP project in Przemysl.


Zakłady Chemiczne Police S.A./ Access Ltd.
2005
Technical and market due-diligence of power generation systems with two CHP plants at ZCh Police for the Treasury as part of privatisation process. CHP plants have 6 pulverised fuel boilers with a 38 MWe turbine and 2 PF boilers with a 64MWe turbine set.
As part of the works, also the analysis of optimising the energy system of ZCh Police was made.

Vattenfall Heat Poland
2005

Environmental due diligence of Zabrze CHP Plant (106MW/595MWt) in the privatisation process.
Risks related to current and planned environmental protection requirements were identified. The condition of installations was assessed in terms of compliance with current and future environmental requirements. Planning was evaluated and necessary environmental investments were identified.

Elsam A/S
2005
Technical and environmental due diligence of WPEC Legnica as part of privatisation process.
WPEC Legnica supplies heat to Legnica and neighbouring towns as well as to Głogów and Lubin. The company has 3 heat plants (230MWt, 23MWt, 162MWt), 9 heat-only boiler plants of total capacity 33 MWt and a district heating network.
Technical status of equipment was assessed, and technical risks were identified. Risks related to legislation were evaluated, including environmental protection legislation. Local heat market was analysed.

Elsam A/S
2005
Pre-feasibility Study of a Biomass Fired CHP Plant (10-15 MWe with various cogeneration ratios.
The analysis covered a number of solutions for biofuels management and logistics. Feasibility of installing a flue gas condenser to recover heat for district heating was analysed as an additional option.

EC Bialystok S.A.(SNET)
2004
Preliminary feasibility study of a project involving power production based on renewable energy sources.


Hedeselskabet Polska
2004
Development, negotiations and assistance in signing renewable power sale agreements with three power distribution companies.


Elsam A/S
2004

Preliminary feasibility study for a biomass fired CHP (20 MWe and 40 MWt) in the north of Poland.
The analysis covered a number of solutions for biofuels management and logistics. Feasibility of installing a flue gas condenser to recover heat for district heating was analysed as an additional option.


Elsam A/S
2004

Due diligence and appraisal of heating company in the north of Poland by discounted planned cash flow method, taking into account extension of the existing generation facilities with a biomass unit. The project also included preliminary analysis as well as technical and economic concept for the biomass unit located at the area of the existing heating plant and connected to the municipal DH system.

Elsam A/S
2004
Assessment of biomass resources accessibility from forest areas and industry in north-eastern Poland.

EC Rzeszów S.A
2004
Service Contract for Rzeszów CCGT Plant
The project includes preparing tender announcement and a complete tender specification as well as tender evaluation, contract negotiations and drafting a service contract in accordance with the new Public Procurement Law.

PAK
2003-2006
Pątnów II.
Participation in Elsam Engineering project, covering review and verification of turn-key contract documentation for the construction of Pątnów II Power Plant, and detailed verification of turbine and boiler efficiency, as well as determining optimisation possibilities in that area. Parameters and performance of the plant was compared to parameters of comparable plants in Danish power sector. Compliance of Pątnów II Power Plant with UTCE requirements was verified.

Undisclosed Client
2003
Due diligence services for 37 MW CCGT project in Starachowice, review of fuel supply contracts, EPC contract.

Elektrociepłownie Warszawskie
2003-2004

Study on EW S.A. (present VHP) development until 2020.
The work included analysis of development directions for VHP heat sources until 2020, taking into account internal conditions as well as the changing external factors (such as market conditions, environmental requirements etc.) For the purpose of the study, a uniform dynamic technical and economic model of all heat sources was prepared, including all VHP heat sources, split to generation units operating in Warsaw DH system (SPEC district heating network) and Pruszkow CHP. The model allows comparing the analysed development alternatives. The technical model included efficiency data of the existing and new equipment, minimum and maximum generation capacities of turbines and boilers, fuel parameters, emissions and furnace waste production, use of absorbent, water and other consumable media in the existing and new flue gas cleaning installation as well as a dynamic O&M model, taking into account operation hours, investment costs and O&M costs.
As a result of the work, possible investment alternatives were presented, including environmental installations for the existing facilities as well as construction of new generation facilities, such as new boilers, new coal-fired CHP units of various capacities, including a large supercritical unit, combined cycle CHP units of 60-250MWe at various locations, small biomass or multi-fuel CHP units. Basing on the prepared model of DH main lines, limitations of DH networks were analysed as well as the DH network modernisation and extension alternatives for the analysed options of heat allocation between heat sources. Feasibility of incorporation of heat accumulator (capacity 5000-20 000 m3) was also analysed.

EC Rzeszow S.A.
2003
Defect Liability Engineer services for CCGT Rzeszow (100 MWe).


Intercell S.A.
2003-2004

Concepts for long term energy supply to secure Intercell energy demand.
Technical condition of the equipment was assessed, and a concept of constructing a new industrial CHP plant of 50-100 MWe was presented. A number of fuel alternatives and technologies were analysed, using coal or natural gas as primary fuel. Each alternative included also applying waste biomass, sewage sludge and waste wood for power purposes. Possibility of connection to the national power grid was assessed.

Elektrownia Bełchatów S.A
2003
Turbine Hall Equipment Modernisation Concept Study for units 3-12 of Bełchatów Power Plant in 2007-2015. Technical condition assessment. Modernisation proposals taking into account available modern technologies and implications related to Poland joining EU.

Intercell S.A.
2003
Due-diligence of energy management at the paper mill in Myszków.


EC Lublin Wrotkow
2002

Defect Liability Engineer services for CCGT Wrotkow (235 MWe).


Elsam A/S
2002-2003

Owner’s Engineer services during the construction of Zagórze Wind Farm (30 MW).
Full Owner’s supervision, verification of documentation, take-overs.

Elsam A/S
2002

Consulting services during preparation, negotiations and conclusion of long-term power sale contracts for renewable energy.
Consulting services for renewable energy sale in balancing market.

Elsam A/S
2002
Consultancy services during negotiations of conditions of connecting to the power grid, interconnection agreement and transmission agreement for 30MW wind farm.

Sydkraft A/S
2002
Technical due diligence in STAR-PEC – district heating company in Starogard Gdański.
The company has a heat plant of 58MWt and 16 local heat-only boiler plants (HOB) of total capacity of 17MWt, as well as a DH network of 21,5 km with 242 heat exchange nodes.

Undisclosed Client
2002
Market analysis of the energy sector in Poland, including analyses of fuel market, power market and cogeneration market, as well as predictions of fuel and energy prices.

Undisclosed Client
2002

Due diligence study investigating the possibilities for a 30 MW wind farm project in Poland.

AES Horizons Ltd.
2002

Involved preparation of tender materials.
Involved in permitting procedures for a 250 MW CCGT project in Żarnowiec, Northern Poland.

Elektrownie Szczytowo-Pompowe S.A.
2001
Concept of a 22 MW wind farm in Loznica, including feasibility study and a application for issuing development conditions.



INTERCELL S.A.
2001

Analysis of alternative heat supply for the paper factory by constructing an industrial CCGT plant (approx. 30 MWe and 140 MWt) or a gas-fired heat plant.

Łęczyńska Energetyka
Sp. z o.o.
2001
Feasibility study for an approx. 30 MWe CHP plant with CFB boiler at Bogdanka coal mine, based on coal slurry, waste coal, sludge from sewage treatment plant and municipal waste.


Zielona Góra CHP Plant
2001

Verification of tender documentation for the second stage of tendering procedure for a 190 MWe CCGT CHP plant in Zielona Góra.


Legnica DH Company
2001

Verification of feasibility study for converting the municipal heat plant in Legnica into a CHP plant basing on the existing steam boilers, capacity of approx. 10 MWe.


EC Białystok S.A.
2001
Verification and preparation of tender materials for construction of a 20 MWe condensing turboset at Bialystok CHP Plant.
Participation in tender evaluation and selection of the Contractor.
The project is based on a number of contracts (turbine set, DCS cooling tower, equipment deliveries).

Undisclosed client
2001
Due Diligence in PEC Slupsk (Slupsk District Heating Company). ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of a heat distribution company as part of privatisation process. The company has two heat plants of 87MW and 74,5MW respectively, and 66 km DH network.
The job was performed for a foreign Client.

Undisclosed client
2001
Due Diligence in a large industrial CHP.
ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in the preliminary phase of due diligence in an industrial CHP plant to be outsourced from a large industrial plant. The CHP plant, fuelled with hard coal , has a capacity of approx. 100 MWe and approx. 200 MWt. ELSAMPROJEKT scope included evaluation of the process systems, heat demand assessment, analysis of development possibilities of the CHP plant in relation to the entire industrial plant. The job was performed for a foreign Client.

Sydkraft A/S
2001
Due Diligence in Gorzow District Heating Company.
ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of a heat distribution company as part of privatisation process. Gorzow Heat Distribution Company (PEC) DH system is the main heat supplier to the town of Gorzow Wielkopolski (population of 126,000). The system is supplied from three heat sources. Total demand for heat is approx. 140 MW, 1000 TJ/year. The scope included technical part of due diligence, in particular technology evaluation, heat market evaluation, development and investment programme assessment, taking into account environmental aspects.

Mott MacDonald / PSEG
2001-2003
Owner’s Engineer services during the construction of Elcho Chorzow CHP plant, 2x102 MWe, including electrical connection and DH connection, Owner’s supervision, technical handover of equipment (incl. Tubines and generators), verification of technical documentation and supervision over transport and hydraulic assembly of turbines.

EC Gorzów
2001
Verification and preparation of service contract for a CCGT plant.


Elektrownia Opole S.A.
2000-2001
Technical and economic assessment of “Technical conditions for Opole Power Plant connection to Opole municipality DH network” issued by ECO S.A
The analysis included influence of design temperatures, pressure and regulation method (quality or quantity) on feasibility of supplying 200 MWt heat from 18K360 turbine extractions to DH network of Opole by a planned DH pipeline of 9 km.

Elektrociepłownia Zielona Góra S.A.Sydkraft A/S
2001
Technical Due Diligence in the CHP privatisation process, on behalf of Sydkraft.
ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of Zielona Góra CHP Plant (238MWt, 22.5 MWe, hard-coal fired) as part of privatisation process. ELSAMPROJEKT scope included all the technical issues, such as evaluation of the process systems at the plant, power and heat market evaluation, cost and price structure analysis, development programme analysis including the planned extension of CHP plant with a 190MWe CCGT unit.

Elektrociepłownia Rzeszów SA
2000-2003

Owner’s Engineer services for new CCGT Rzeszów (98 MWe), Owner’s supervision, technical take-overs of equipment, including turbines and generators, verification of technical documentation, commissioning supervision and handovers.

Elektrociepłownia Lublin Wrotków
2000-2002
Owner’s Engineer services for new CCGT Wrotków (235 MWe), Owner’s supervision, technical take-overs of equipment, including turbines and generators, verification of technical documentation, commissioning supervision and handovers.

Bank Pekao S.A.
2000

Independent Technical Advisor to the bank for the implementation of new CCGT Wrotków (235 MWe).

Colombo Power (Private) Limited
2000
Technical supervisory services to certify, witness and review performances tests and commissioning for 60 MW barge-mounted power plant in Sri Lanka, built by Mitsui Engineering & Shipbuilding Co. Ltd., Japan, consisting of 4 diesel generators. Reporting.

Vattenfall Poland
2000
Study “Optimisation and development of Warsaw district heating system”
In the study, strategic development directions for the Warsaw district heating system were marked, in order to increase the cogeneration ratio in Warsaw.

Vattenfall Poland
2000
Assistance to a due diligence team in connection with privatisation of GZE S.A. for one of potential investors Site visits at HV/MV stations and MV/LV substations owned by GZE.

Elektrociepłownia Rzeszów SA
2000

Drafting of Maintenance Agreement for new CCGT Rzeszów (95 MWe).



Elektrownia „OPOLE” S.A.
2000

Tender specification and offer evaluation for turbine modernisation and preparation of heat extraction. For three 18K360 turbines with a capacity of 360 MWe each.


PSE (Polish Power Grid Company)
1999-2000

Report on development of small-scale gas-fired cogeneration plants in European countries.


Ministry of the Treasury, Access Ltd.
1999
Participation in Wybrzeże CHP Group (Gdańsk) privatisation process. Elsamprojekt’s tasks included:
Technical assessment and value estimation of CHP buildings and equipment.
Market analysis and Wybrzeże’s position, including power and heat price projection until 2010.
Assessment of Wybrzeże technology as compared to Polish and international conditions.

Vattenfall Poland
Sp. z o.o.
1999
Technical Advisor in the privatisation team for Warsaw CHP Plants (Elektrociepłownie Warszawskie S.A.). Services of technical due diligence included:
Technical Due Diligence of the plants;
Development potential forecast, including risk evaluation;
Collecting input data for the model of power and heat production balance;
Company structure assessment.

Elektrociepłownia Rzeszów S.A.
1999
Preparation and verification of tender specification for EC Rzeszów CCGT (95 MWe);
Tender evaluation.
Contract negotiations.
The tender was prepared based on Public Procurement Law.

PAK Power Stations Group
1999

Ultra Super Critical steam parameters. Optimisation study for Pątnów II Power Project.



Undisclosed Client
1999

Technical due diligence of an industrial CHP plant at the fat processing factory in Brzeg.


Undisclosed Client
1999

Assessment of environmental issues regarding aluminium foundry at the Kety Metal Processing Factory.


Zamojska Spółka Elektroenergetyczna Eastern Generation
1998

Preparation of full tender documentation for turn-key project involving construction of 100-120 MW CCGT plant in Jarosław. Participation in negotiations with Polish Oil and Gas Company (PGNiG) and distribution company.


Elektrownia Opole S.A.
1997-1998
Rationalization and availability study for Opole Power Plant.
ELSAMPROJEKT made a review of company structure and investigated possibilities of employment reductions at Opole Power Plant so as to improve the organisation, operation mode and employment following the example of a comparable foreign (Danish) power plant.

Enron
1998-2000

For the 120 MW industrial combined cycle plant to be erected in Nowa Sarzyna, ELSAMPROJEKT support the investor with Site Manager and site supervisors for the erection and commissioning of the plant, including connection to the grid.

Swe-Pol Link
1998-1999

The 300 MW HVDC project between Poland and Sweden. Site supervision on behalf of the investor.


Undisclosed client
1998
Due diligence study for 10 MW windfarm project in Poland. Activities included production estimate for the windfarm, investment cost, energy pricing, ownership structure and assessment of the economy.

Kobo Sp. z o.o.
1998-1999
A feasibility study analysing construction of a CHP plant (30 MWe, 60 MWt) with fluidised bed boilers at Bogdanka coal mine, using waste coal from the mine.
The study also analysed the possibility to cover heat demand of neighbouring towns by the new CHP plant.

Energoinwest Białystok
1998-1999
Feasibility study for modernisation of Fasty CHP plant in Bialystok, covering usage of sludge from the municipal sewage treatment plant as fuel for the boilers of the CHP plant.
The feasibility study will cover technical solutions as well as economic and financial issues related to finding short term as well as long term solutions for the CHP plant and the municipal sewage treatment plant. Issues related to combustion of sewage sludge were an essential part of the study.

ABB Sweden
1998

Construction permit for HVDC cable project between Poland and Sweden. Authorisation of civil design.

Starogard Gdański Polpharma S.A./Vattenfall Poland Sp. z o.o.
1998

Co-operation with Vattenfall in connection with commissioning of new fluidised boilers at industrial CHP owned by Polpharma pharmaceutical plant.




Chełm Zamojska Spółka Elektroenergetyczna Eastern Generation Ltd.
1998
Feasibility study of a CHP unit for the city of Chełm.
Analysed alternatives included a 60 MWe gas fired combined cycle plant, as well as 60 MWe coal fired CFB and PC boiler plants. The issue of utilising waste coal from the nearby Bogdanka coal mine was discussed in detail.



Opole Power Plant
1997-1998
Analysis researching the possibilities of introducing technical and organisational changes at Opole Power Plant, to improve and rationalise its operation. The coal﷓fired power plant consists of 4 equal units with a capacity of approx. 350 MWe and is one of Poland's most modern power plants. Technical benchmarking with Danish power plants.

Bełchatów II Power Plant Management
1997
Independent expert opinion for the study on super critical parameters and optimisation of unit capacity for Bełchatów II.


Kostrzyn Paper MillVattenfall Poland
Sp. z o.o.
1997
Feasibility study covering rehabilitation of an industrial CHP plant at Kostrzyn Paper Mill.
The study covered analysis of heat and power demand and a technical assessment of the existing equipment. The alternatives analysed included combined cycle alternative consisting of gas turbines and waste heat recovery boilers with supplementary firing, each with a capacity of 70 ton/h steam.
Preparation of full tender documentation for modernisation of the existing and erection of two new gas fired boilers.
Tendering procedure and selection of Contractor.

Elektrociepłownia Zielona Góra S.A.Danish Energy AgencyPartner: DPC.
1995 - 1998
Preliminary feasibility study for modernisation Zielona Góra CHP Plant. The project was grant supported by the Danish Energy Agency and co-financed by EC Zielona Góra.
The project included determining the heat, steam and electricity demand. A number of plant concepts were analysed such as biomass fired boiler and gas fired combined cycle plants. The use of domestic low calorific gas was analysed.
A combined cycle plant with a capacity on 100 MWe based on domestic gas was analysed in details covering technical, economic as well as financial matters including defining security package covering off-take contracts.


Zespół Elektrowni Ostrołęka
1994 - 1995
Feasibility study for modernisation of Ostrołęka A CHP plant.
The following alternatives were investigated: rehabilitation of existing CHP, district heating extraction from power plant Ostrołęka B, new coal fired CFB CHP, new combined cycle gas fired CHP. The coal fired CFB and the gas fired Combined Cycle plant were selected as the most attractive solutions and detailed financial analysis were prepared for these alternatives.

Zespół Elektrowni Ostrołęka
1995-1995
Pre-feasibility study of bark firing at Ostrołęka A CHP Plant.
The following alternatives were investigated: new multifuel CFB boiler, additional furnace to the existing boilers, new Bubbling Fluidized Bed (BFB) boiler, retrofit of the existing PC boiler to BFB bark firing boiler. The latter alternative was implemented.
ELSAMPROJEKT prepared investment package, and long-term fuel supply contract, implementation study, detailed tender specification, and contract with main contractor.

Zespół Elektrociepłowni
Bielsko-Biała SA
and EBRD
1994–1997
Owner’s Engineer services for European Bank for Reconstruction and Development (EBRD) during the construction of a turn-key project involving the construction of 55 MW CHP unit.
The project was subsidised by the European Bank for Reconstruction and Development.


Polskie Sieci Elektroenergetyczne S.A.Danish Environmental Protection Agency
1993-1994

Technical Assistance to Polish Power Grid Company (PSE)
Preparation of a study "Potential of priority and CHP Development in Poland" for the Polskie Sieci Elektroenergetyczne (Polish Power Grid Company).
In 1992 PSE agreed with the World Bank to initiate a least cost plan for the development and rehabilitation of the Polish power plants. Part of this study is an analysis of the potential for development of cogeneration on the basis of existing and new power plants.

ABB Power Generation, Baden, Switzerland
1993
Technical Assistance in connection with TEP1 at Turów Power Station.
In cooperation with Ahlstrom PyroPower (USA) ABB Power Generation was awarded the contract to rehabilitate up to six units of the Polish lignite-fired 2000 MW power station in Turów. The rehabilitated units were supplied with new turbines/generators and new CFB boilers. The capacity of each unit is 230 MWe.
Prior to the rehabilitation, a Technical Evaluation Package (TEP1) was carried out in order to determine how much of the existing installation could be reused under the new conditions.