Vattenfall
Heat
Poland
2011 – in progress |
Environmental
impact report for a project of extending Zeran CHP by constructing a
450MW CCGT plant with all necessary infrastructure and elements of
spatial arrangement, including 5-month full nature inventory and
thermal analysis of the discharge of post-cooling water to the Vistula
and Zeran Canal.
|
Vattenfall
Heat Poland
2008 |
Preparing
applications for environmental conditions as part of power units
construction permit procedure, for the following plants:
480 MWe coal
fired unit, two CCGT units 400MW each, 250 MW CCGT and 68 MW
coal-and-biomass fired CHP plant
with all the necessary documentation.
|
Vattenfall
Heat
Poland
2008 |
Preparing
applications for issuing development conditions for the following power
units:
480 MWe coal fired unit, two CCGT units 400MW each, 250 MW CCGT
and 68 MW coal-and-biomass fired CHP plant
with all the necessary
documentation. Applications were based on technical concepts prepared
basing on studies analysing multiple alternatives.
|
Vattenfall
Heat Poland
2007 |
Environmental
impact assessment report regarding wet desulphurisation plant for
Siekierki CHP Plant, preparing application for environmental decision,
submission of application to the relevant environmental authorities and
negotiations with the authorities. The project obtained environmental
decision for constructing the plant.
|
Vattenfall
Heat Poland
2006 |
Environmental
impact report for a project involving construction of a new 480 MWe
unit at Siekierki CHP Plant in Warsaw, prepared in order to obtain
environmental permit for the project. The report includes the
environmental impact of the entire Siekierki CHP Plant after
implementing the new unit and the planned environmental systems (flue
gas desulphurisation and deNOx plants).
|
Undisclosed
Client
1999
|
Assessment of environmental issues
regarding aluminium foundry at the Kety Metal Processing Factory.
|