Certificate 9444 QMS 2011O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoHeat accumulatorsBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



Owners Engineer



Client/Year Project description
DONG Energy A/S
2009-2010
Owner’s Engineer services during the construction of Karcino Wind Farm (51 MW).
The scope of work included preparing tender specification for EPC Contract based on FIDIC for electrical and civil engineering part, participation in negotiations with contractors and Owner’s Engineer service for electrical and civil engineering part.

DONG Energy A/S
2007-2010
Owner’s Engineer services during the construction of Karnice Wind Farm (30 MW).
The scope of work included preparing two tender specifications for EPC Contracts based on FIDIC for electrical and civil engineering part, participation in negotiations with contractors and Owner’s Engineer service for electrical and civil engineering part.

EC Białystok S.A. (E.On Group)
2007-2008
Owners Engineer. The project involves construction of biomass plant for renewable power generation. It included PF coal fired boiler conversion into a bubbling fluidised bed (BFB) boiler firing biomass similar to wood chips, and construction of complete biomass handling system. Boiler capacity after modernisation 105t/h steam; annual biomass consumption up to 200,000 t.

EC Białystok S.A.(E.On Group)
2005-2009
Modernisation and automation project for Białystok CHP Plant. Elsamprojekt was a Project Manager for the entire project. Automation was carried out at three CHP units of EC Białystok and included auxiliary systems, and DH water pumping stations were also replaced. The scope of work included preparing Tender Specification and tender evaluation, and advisory services during the implementation of automation werks, as well as coordination of construction and overhaul works.
As part of the project, basing on documentation prepared by the Client, automation of DCS system for the following plants was carried out:
-   units BC - 50 no. 1, 2, 3
- auxiliary systems including coal handling, slag handling, ash handling, start-up oil system, connection to the power grid, water conditioning plant
ELSAMPROJEKT Polska managed the preparation of modernisation and automation programme, and supervised design and erection works performed by external contractors.

EC Rzeszow S.A.
2003
Defect Liability Engineer services for CCGT Rzeszow (100 MWe).


EC Lublin Wrotkow
2002

Defect Liability Engineer services for CCGT Wrotkow (235 MWe).


Elsam A/S
2002-2003

Owner’s Engineer services during the construction of Zagórze Wind Farm (30 MW).
Full Owner’s supervision, verification of documentation, take-overs.

Mott MacDonald / PSEG
2001-2003
Owner’s Engineer services during the construction of Elcho Chorzow CHP plant, 2x102 MWe, including electrical connection and DH connection, Owner’s supervision, technical handover of equipment (incl. Tubines and generators), verification of technical documentation and supervision over transport and hydraulic assembly of turbines.

Elektrociepłownia Rzeszów SA
2000-2003

Owner’s Engineer services for new CCGT Rzeszów (98 MWe), Owner’s supervision, technical take-overs of equipment, including turbines and generators, verification of technical documentation, commissioning supervision and handovers.

Elektrociepłownia Lublin Wrotków
2000-2002
Owner’s Engineer services for new CCGT Wrotków (235 MWe), Owner’s supervision, technical take-overs of equipment, including turbines and generators, verification of technical documentation, commissioning supervision and handovers.

Colombo Power (Private) Limited
2000
Technical supervisory services to certify, witness and review performances tests and commissioning for 60 MW barge-mounted power plant in Sri Lanka, built by Mitsui Engineering & Shipbuilding Co. Ltd., Japan, consisting of 4 diesel generators. Reporting.

Enron
1998-2000

For the 120 MW industrial combined cycle plant to be erected in Nowa Sarzyna, ELSAMPROJEKT support the investor with Site Manager and site supervisors for the erection and commissioning of the plant, including connection to the grid.

Swe-Pol Link
1998-1999

The 300 MW HVDC project between Poland and Sweden. Site supervision on behalf of the investor.


Zespół Elektrociepłowni
Bielsko-Biała SA
and EBRD
1994–1997
Owner’s Engineer services for European Bank for Reconstruction and Development (EBRD) during the construction of a turn-key project involving the construction of 55 MW CHP unit.
The project was subsidised by the European Bank for Reconstruction and Development.