Certificate 9444 QMS 2011O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoHeat accumulatorsBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



Due diligence



Client/Year Project description
J-Power
2006
Due diligence and review of documentation for a wind farm to be constructed in northern Poland (Zajączkowo, 24x2MW),, carried out for the Investor in order to provide a basis for the final decision on project implementation.

Karpacka Spółka Gazownictwa S.A. / Pekao Access
2006
Technical due diligence of Łańcut heat plant as part of privatisation process.
The heat plant has 30 MWt thermal capacity in coal fired grate water boilers and approx. 10 km of DH network.
Technical condition of heat plant equipment was evaluated – as well as the need for modernisation. Operation of the CHP plant was evaluated and the heat sale was analysed. Alternative modernisation programmes were prepared. Technical risk was evaluated.

Vattenfall Heat Poland
2005
Environmental due diligence of Kozienice Power Plant (coal fired units 8x200MW, 2x500MW), including necessary environmental investment projects.
Risk related to adopted and planned environmental regulations were identified and evaluated. Condition of the plant in terms of compliance with current and future requirements of environmental protection. Planned investments were assessed and the necessary investments were indicated in the context of environmental protection.

PCC AG
2005
Technical and market due diligence of Kozienice Power Plant. (coal fired units 8x200MW, 2x500MW) as part of privatisation process.
Technical evaluation of Power Plant equipment was made and technical risks were identified. Risks related to legislation including environmental legislation was assessed. The power plant investment programme was assessed as well as the position of the plant on the Polish market. Technical and economic model of the plant was made and a proposal for the plant development was drafted, including calculation of the power plant value based on long term cash flow projection.

Vattenfall Heat Poland
2005
Environmental due diligence of Bydgoszcz CHP Plant. The power plant group consists of three CHP plants of respective capacities 187 MW/270MWt, 810MWt and 80MWt.
Risks related to current and planned environmental protection requirements were identified and evaluated. The condition of installation was assessed in terms of compliance with the current and future environmental standards. Planned investments were assessed and necessary environmental assessments were identified.

PCC AG
2005
Technical and market due diligence for Ostroleka Power Plant Group (ZEO).
The power plant group consists of a CHP Plant (75MWe/367MWt) and a power plant (647MW). Technical condition of the power plant and CHP plant equipment were assessed and technical risks were identified. Risks related to legislation were assessed, including environmental legislation. ZEO investment progress was evaluated. ZEO position in the Polish market was estimated. A technical and economic model of ZEO was prepared. A proposal of development was prepared together with a calculation of ZEO value basing on long term cash flow projections.

Zakłady Chemiczne Police S.A./ Access Ltd.
2005
Technical and market due-diligence of power generation systems with two CHP plants at ZCh Police for the Treasury as part of privatisation process. CHP plants have 6 pulverised fuel boilers with a 38 MWe turbine and 2 PF boilers with a 64MWe turbine set.
As part of the works, also the analysis of optimising the energy system of ZCh Police was made.

Vattenfall Heat Poland
2005

Environmental due diligence of Zabrze CHP Plant (106MW/595MWt) in the privatisation process.
Risks related to current and planned environmental protection requirements were identified. The condition of installations was assessed in terms of compliance with current and future environmental requirements. Planning was evaluated and necessary environmental investments were identified.

Elsam A/S
2005
Pre-feasibility Study of a Biomass Fired CHP Plant (10-15 MWe with various cogeneration ratios.
The analysis covered a number of solutions for biofuels management and logistics. Feasibility of installing a flue gas condenser to recover heat for district heating was analysed as an additional option.

Elsam A/S
2004

Due diligence and appraisal of heating company in the north of Poland by discounted planned cash flow method, taking into account extension of the existing generation facilities with a biomass unit. The project also included preliminary analysis as well as technical and economic concept for the biomass unit located at the area of the existing heating plant and connected to the municipal DH system.

Undisclosed Client
2003
Due diligence services for 37 MW CCGT project in Starachowice, review of fuel supply contracts, EPC contract.

Intercell S.A.
2003
Due-diligence of energy management at the paper mill in Myszków.


Sydkraft A/S
2002
Technical due diligence in STAR-PEC – district heating company in Starogard Gdański.
The company has a heat plant of 58MWt and 16 local heat-only boiler plants (HOB) of total capacity of 17MWt, as well as a DH network of 21,5 km with 242 heat exchange nodes.

Undisclosed Client
2002

Due diligence study investigating the possibilities for a 30 MW wind farm project in Poland.

Undisclosed client
2001
Due Diligence in PEC Slupsk (Slupsk District Heating Company). ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of a heat distribution company as part of privatisation process. The company has two heat plants of 87MW and 74,5MW respectively, and 66 km DH network.
The job was performed for a foreign Client.

Undisclosed client
2001
Due Diligence in a large industrial CHP.
ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in the preliminary phase of due diligence in an industrial CHP plant to be outsourced from a large industrial plant. The CHP plant, fuelled with hard coal , has a capacity of approx. 100 MWe and approx. 200 MWt. ELSAMPROJEKT scope included evaluation of the process systems, heat demand assessment, analysis of development possibilities of the CHP plant in relation to the entire industrial plant. The job was performed for a foreign Client.

Sydkraft A/S
2001
Due Diligence in Gorzow District Heating Company.
ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of a heat distribution company as part of privatisation process. Gorzow Heat Distribution Company (PEC) DH system is the main heat supplier to the town of Gorzow Wielkopolski (population of 126,000). The system is supplied from three heat sources. Total demand for heat is approx. 140 MW, 1000 TJ/year. The scope included technical part of due diligence, in particular technology evaluation, heat market evaluation, development and investment programme assessment, taking into account environmental aspects.

Elektrociepłownia Zielona Góra S.A.Sydkraft A/S
2001
Technical Due Diligence in the CHP privatisation process, on behalf of Sydkraft.
ELSAMPROJEKT provided consultancy engineering services for one of the potential investors in a due diligence of Zielona Góra CHP Plant (238MWt, 22.5 MWe, hard-coal fired) as part of privatisation process. ELSAMPROJEKT scope included all the technical issues, such as evaluation of the process systems at the plant, power and heat market evaluation, cost and price structure analysis, development programme analysis including the planned extension of CHP plant with a 190MWe CCGT unit.

Vattenfall Poland
2000
Study “Optimisation and development of Warsaw district heating system”
In the study, strategic development directions for the Warsaw district heating system were marked, in order to increase the cogeneration ratio in Warsaw.

Vattenfall Poland
2000
Assistance to a due diligence team in connection with privatisation of GZE S.A. for one of potential investors Site visits at HV/MV stations and MV/LV substations owned by GZE.

Ministry of the Treasury, Access Ltd.
1999
Participation in Wybrzeże CHP Group (Gdańsk) privatisation process. Elsamprojekt’s tasks included:
Technical assessment and value estimation of CHP buildings and equipment.
Market analysis and Wybrzeże’s position, including power and heat price projection until 2010.
Assessment of Wybrzeże technology as compared to Polish and international conditions.

Vattenfall Poland
Sp. z o.o.
1999
Technical Advisor in the privatisation team for Warsaw CHP Plants (Elektrociepłownie Warszawskie S.A.). Services of technical due diligence included:
Technical Due Diligence of the plants;
Development potential forecast, including risk evaluation;
Collecting input data for the model of power and heat production balance;
Company structure assessment.

Undisclosed Client
1999

Technical due diligence of an industrial CHP plant at the fat processing factory in Brzeg.