Certificate 9444 QMS 2011O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoHeat accumulatorsBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



Technical analysis



Client/Year Project description
Synthos Dwory
Sp. z o.o. Oświęcim
2011 - in progress
Modernisation programme for Synthos Dwory CHP plant.
The work included preparing a concept for plant reconstruction in the form of several alternative investment programmes based on modernisation projects and construction of new coal or gas fired plants as well as reserve and peak load sources fired with various fuels (coal, natural gas, landfill gas, light fuel oil), several process heat demand scenarios (CHP capacity from 250 to 700MWt) and unit operation regime (full cogenetaion, partial condensing mode). Selection of the optimum investment programme was made basing on the most profitable process system, the fuel used and the reliability of heat supply to Synthos Dwory.

Elektrociepłownia
EC Nowa Sp. z o.o. (Tauron)
2011
Modernisation concept for EC Nowa pumping systems.
The objective was to prepare an optimum concept for the modernisation of the pumping systems at industrial EC Nowa CHP Plant (120MWe, 1580 t/h steam), including piping, metering systems, control and instrumentation and power supply, in order to reduce power consumed by the pumping systems. The study presents the results of energy audit of the pumping facilities and a multi-variant concept of modernisation, indicating optimum solutions. The analysis covered feed water pumps, cooling water pumps, district heating water pumps and process water pumps. As a result of the study, an economically feasible modernisation concept was proposed, resulting in the total reduction of power consumption by approx. 32 GWh/a.

J-Power, Zajaczkowo Wind Farm
2007
Preparation of Wind Farm Operation and Maintenance Manual, including the requirements for wind farm operator and power grid operator regarding the division of equipment in terms of operation and maintenance, operation of 110/30 kV substation and wind turbine, operation actions, safety principles, co-ordination of operation and maintenance.

Zakłady Chemiczne Police S.A.
2006

Concept of fuel conversion from fuel oil to natural gas for selected systems of Police Chemical Plant.
The work included technical and economic analyses of multiple alternatives for fuel conversion from the currently used mazout and light fuel oil to natural gas. Basing on the economic analysis, which included investments costs, differences in the fuel costs and in the related costs (such as operation costs, environmental costs, maintenance costs), recommended alternatives were presented.

BOT Elektrownia Bełchatów S.A
2005-2006
Study on location of flue gas desulphurisation plant for units 1 and 2, aimed to select a location optimal form both economic and technical point of view.


EC Bialystok S.A.(SNET)
2004
Preliminary feasibility study of a project involving power production based on renewable energy sources.


Starogard Gdański Polpharma S.A./Vattenfall Poland Sp. z o.o.
1998

Co-operation with Vattenfall in connection with commissioning of new fluidised boilers at industrial CHP owned by Polpharma pharmaceutical plant.




ABB Power Generation, Baden, Switzerland
1993
Technical Assistance in connection with TEP1 at Turów Power Station.
In cooperation with Ahlstrom PyroPower (USA) ABB Power Generation was awarded the contract to rehabilitate up to six units of the Polish lignite-fired 2000 MW power station in Turów. The rehabilitated units were supplied with new turbines/generators and new CFB boilers. The capacity of each unit is 230 MWe.
Prior to the rehabilitation, a Technical Evaluation Package (TEP1) was carried out in order to determine how much of the existing installation could be reused under the new conditions.