O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowiskoBieżące projektyAktualnościKontaktPracaBiblioteka     Logo



Technical analysis



Klient/Rok Opis przedsięwzięcia

O&M Manual Zajaczkowo Wind Farm
2007

Preparation of Wind Farm Operation and Maintenance Manual, including the requirements for wind farm operator and power grid operator regarding the division of equipment in terms of operation and maintenance, operation of 110/30 kV substation and wind turbine, operation actions, safety principles, co-ordination of operation and maintenance.

BOT Elektrownia Bełchatów S.A.
2005-2006

Study on location of flue gas desulphurisation plant for units 1 and 2, aimed to select a location optimal form both economic and technical point of view.


Rzeszow CHP Plant
2003

Defect Liability Engineer services for CCGT Rzeszow (100 MWe).



Lublin Wrotkow CHP Plant
2002

Defect Liability Engineer services for CCGT Wrotkow (235 MWe).


Elsam A/S
2002

Consultancy services during negotiations of conditions of connecting to the power grid, interconnection agreement and transmission agreement for 30MW wind farm.

Starogard Gdański Polpharma S.A.Vattenfall Poland Sp. z o.o.
1998

Co-operation with Vattenfall in connection with commissioning of new fluidised boilers at industrial CHP owned by Polpharma pharmaceutical plant.

ABB Power Generation, Baden, Switzerland
1993 - 1993

Technical Assistance in connection with TEP1 at Turów Power Station.In cooperation with Ahlstrom PyroPower (USA) ABB Power Generation was awarded the contract to rehabilitate up to six units of the Polish lignite-fired 2000 MW power station in Turów. The rehabilitated units were supplied with new turbines/generators and new CFB boilers. The capacity of each unit is 230 MWe.Prior to the rehabilitation, a Technical Evaluation Package (TEP1) was carried out in order to determine how much of the existing installation could be reused under the new conditions.