Certificate 9444 QMS 2011O nasStruktura własnościZarządDziałyCo robimyUsługiWspółpracaUprawnieniaReferencjeStudium wykonalnościWykorzystanie biomasyWykorzystanie odpadówSpecyfikacja/PrzetargiAnaliza rynkowa; umowyAnaliza technicznaInżynier KontraktuDue diligenceOdziaływanie na środowisko Heat accumulators Bieżące projektyAktualnościKontaktPracaBiblioteka     Logo



Market analysis; contract



Client/Year Project description
Margonin 120 MW Wind Farm
2006
Analysis of renewable energy market in Poland, including evaluation of the present situation and development forecasts (including price projections) for renewable sources.

Hedeselskabet Polska
2004
Development, negotiations and assistance in signing renewable power sale agreements with three power distribution companies.


EC Rzeszów S.A
2004
Service Contract for Rzeszów CCGT Plant
The project includes preparing tender announcement and a complete tender specification as well as tender evaluation, contract negotiations and drafting a service contract in accordance with the new Public Procurement Law.

PAK
2003-2006
Pątnów II.
Participation in Elsam Engineering project, covering review and verification of turn-key contract documentation for the construction of Pątnów II Power Plant, and detailed verification of turbine and boiler efficiency, as well as determining optimisation possibilities in that area. Parameters and performance of the plant was compared to parameters of comparable plants in Danish power sector. Compliance of Pątnów II Power Plant with UTCE requirements was verified.

Elektrociepłownie Warszawskie
2003-2004

Study on EW S.A. (present VHP) development until 2020.
The work included analysis of development directions for VHP heat sources until 2020, taking into account internal conditions as well as the changing external factors (such as market conditions, environmental requirements etc.) For the purpose of the study, a uniform dynamic technical and economic model of all heat sources was prepared, including all VHP heat sources, split to generation units operating in Warsaw DH system (SPEC district heating network) and Pruszkow CHP. The model allows comparing the analysed development alternatives. The technical model included efficiency data of the existing and new equipment, minimum and maximum generation capacities of turbines and boilers, fuel parameters, emissions and furnace waste production, use of absorbent, water and other consumable media in the existing and new flue gas cleaning installation as well as a dynamic O&M model, taking into account operation hours, investment costs and O&M costs.
As a result of the work, possible investment alternatives were presented, including environmental installations for the existing facilities as well as construction of new generation facilities, such as new boilers, new coal-fired CHP units of various capacities, including a large supercritical unit, combined cycle CHP units of 60-250MWe at various locations, small biomass or multi-fuel CHP units. Basing on the prepared model of DH main lines, limitations of DH networks were analysed as well as the DH network modernisation and extension alternatives for the analysed options of heat allocation between heat sources. Feasibility of incorporation of heat accumulator (capacity 5000-20 000 m3) was also analysed.

Elsam A/S
2002

Consulting services during preparation, negotiations and conclusion of long-term power sale contracts for renewable energy.
Consulting services for renewable energy sale in balancing market.

Elsam A/S
2002
Consultancy services during negotiations of conditions of connecting to the power grid, interconnection agreement and transmission agreement for 30MW wind farm.

Undisclosed Client
2002
Market analysis of the energy sector in Poland, including analyses of fuel market, power market and cogeneration market, as well as predictions of fuel and energy prices.

EC Gorzów
2001
Verification and preparation of service contract for a CCGT plant.


Bank Pekao S.A.
2000

Independent Technical Advisor to the bank for the implementation of new CCGT Wrotków (235 MWe).

Elektrociepłownia Rzeszów SA
2000

Drafting of Maintenance Agreement for new CCGT Rzeszów (95 MWe).



PSE (Polish Power Grid Company)
1999-2000

Report on development of small-scale gas-fired cogeneration plants in European countries.


Ministry of the Treasury, Access Ltd.
1999
Participation in Wybrzeże CHP Group (Gdańsk) privatisation process. Elsamprojekt’s tasks included:
Technical assessment and value estimation of CHP buildings and equipment.
Market analysis and Wybrzeże’s position, including power and heat price projection until 2010.
Assessment of Wybrzeże technology as compared to Polish and international conditions.

ABB Sweden
1998

Construction permit for HVDC cable project between Poland and Sweden. Authorisation of civil design.