Margonin
120 MW Wind Farm
2006 |
Analysis
of renewable energy market in Poland, including evaluation of the
present situation and development forecasts (including price
projections) for renewable sources.
|
Hedeselskabet
Polska
2004 |
Development, negotiations and
assistance in signing renewable power sale agreements with three power
distribution companies.
|
EC
Rzeszów S.A
2004 |
Service
Contract for Rzeszów CCGT Plant
The project includes preparing
tender announcement and a complete tender specification as well as
tender evaluation, contract negotiations and drafting a service
contract in accordance with the new Public Procurement Law.
|
PAK
2003-2006 |
Pątnów
II.
Participation in Elsam Engineering project, covering review and
verification of turn-key contract documentation for the construction of
Pątnów II Power Plant, and detailed verification of turbine
and
boiler efficiency, as well as determining optimisation possibilities in
that area. Parameters and performance of the plant was compared to
parameters of comparable plants in Danish power sector. Compliance of
Pątnów II Power Plant with UTCE requirements was verified.
|
Elektrociepłownie
Warszawskie
2003-2004
|
Study
on EW S.A. (present VHP) development until 2020.
The work included
analysis of development directions for VHP heat sources until 2020,
taking into account internal conditions as well as the changing
external factors (such as market conditions, environmental requirements
etc.) For the purpose of the study, a uniform dynamic technical and
economic model of all heat sources was prepared, including all VHP heat
sources, split to generation units operating in Warsaw DH system (SPEC
district heating network) and Pruszkow CHP. The model allows comparing
the analysed development alternatives. The technical model included
efficiency data of the existing and new equipment, minimum and maximum
generation capacities of turbines and boilers, fuel parameters,
emissions and furnace waste production, use of absorbent, water and
other consumable media in the existing and new flue gas cleaning
installation as well as a dynamic O&M model, taking into
account
operation hours, investment costs and O&M costs.
As a result of the
work, possible investment alternatives were presented, including
environmental installations for the existing facilities as well as
construction of new generation facilities, such as new boilers, new
coal-fired CHP units of various capacities, including a large
supercritical unit, combined cycle CHP units of 60-250MWe at various
locations, small biomass or multi-fuel CHP units. Basing on the
prepared model of DH main lines, limitations of DH networks were
analysed as well as the DH network modernisation and extension
alternatives for the analysed options of heat allocation between heat
sources. Feasibility of incorporation of heat accumulator (capacity
5000-20 000 m3) was also analysed.
|
Elsam
A/S
2002
|
Consulting
services during preparation, negotiations and conclusion of long-term
power sale contracts for renewable energy.
Consulting services for
renewable energy sale in balancing market.
|
Elsam
A/S
2002 |
Consultancy
services during negotiations of conditions of connecting to the power
grid, interconnection agreement and transmission agreement for 30MW
wind farm.
|
Undisclosed
Client
2002 |
Market
analysis of the energy sector in Poland, including analyses of fuel
market, power market and cogeneration market, as well as predictions of
fuel and energy prices.
|
EC
Gorzów
2001 |
Verification and preparation of
service contract for a CCGT plant.
|
Bank
Pekao S.A.
2000
|
Independent Technical Advisor to
the bank for the implementation of new CCGT Wrotków (235
MWe).
|
Elektrociepłownia
Rzeszów SA
2000
|
Drafting of Maintenance Agreement
for new CCGT Rzeszów (95 MWe).
|
PSE
(Polish Power Grid Company)
1999-2000
|
Report on development of
small-scale gas-fired cogeneration plants in European countries.
|
Ministry
of the Treasury, Access Ltd.
1999 |
Participation
in Wybrzeże CHP Group (Gdańsk) privatisation process.
Elsamprojekt’s tasks included:
Technical assessment and value
estimation of CHP buildings and equipment.
Market analysis and
Wybrzeże’s position, including power and heat price
projection
until 2010.
Assessment of Wybrzeże technology as compared to Polish and
international conditions.
|
ABB
Sweden
1998
|
Construction permit for HVDC cable
project between Poland and Sweden. Authorisation of civil design.
|